High Throughput and Windows Workflow Foundation - workflow

Can WWF handle high throughput scenarios where several dozen records are 'actively' being processed in parallel at any one time?
We want to build a workflow process which handles a few thousand records per hour. Each record takes up to a minute to process, because it makes external web service calls.
We are testing Windows Workflow Foundation to do this. But our demo programs show processing of each record appear to be running in sequence not in parallel, when we use parallel activities to process several records at once within one workflow instance.
Should we use multiple workflow instances or parallel activities?
Are there any known patterns for high performance WWF processing?

You should definitely use a new workflow per record. Each workflow only gets one thread to run in, so even with a ParallelActivity they'll still be handled sequentially.
I'm not sure about the performance of Windows Workflow, but from what I have heard about .NET 4 at Tech-Ed was that its Workflow components will be dramatically faster then the ones from .NET 3.0 and 3.5. So if you really need a lot of performance, maybe you should consider waiting for .NET 4.0.
Another option could be to consider BizTalk. But it's pretty expensive.

I think the common pattern is to use one workflow instance per record. The workflow runtime runs multiple instances in parallel.
One workflow instance runs one thread at a time. The parallel activity calls Execute method of each activity sequentially on this single thread. You may still get performance improvement from parallel activity however, if the activities are asynchronous and spend most of the time waiting for external process to finish its work. E.g. if activity calls an external web method, and then waits for a reply - it returns from Execute method and does not occupy this thread while waiting for the reply, so another activity in the Parallel group can start its job (e.g. also call to a web service) at the same time.

Related

What queuing tools or algorithms support fair queuing of jobs

I am hitting a well known problem, but I can't find a simple answer that tells me how to solve it.
I would appreciate you directing me by answering which feature I should look for in available queuing software or suitable algorithms if the solution requires programming in addition to the tools. and if you can direct me to Python supported tools, it would be helpful
My problem is that I get over the span of the day jobs which deploy 10, 100 or 1000 tests (I exaggerate , but it helps make a point). Many jobs deploy 10 tests, some deploy 100 tests and one or two deploy 1000 tests.
I want to deploy the tests in such a manner that the delay in execution is spread in a fair manner between all jobs. Let me explain myself.
If the very large job takes 2 hours on a idle server, it would be acceptable if it completes after 4 hours.
If a small job takes 3 minutes on an idle server, it would be acceptable if it completes after 15 minutes.
I want the delay of running the jobs to be spread in a fair way, so jobs that started earlier don't get too delayed. If it looks that the job is going to be delayed more than allowed it's priority will increase.
I think that prioritizing queues may be the solution, so dynamically changing the weights on a large queue will make it faster when needed.
Is there a queue software that knows how to do the above automatically. Lets say that I give each job some time limit and the queue software knows how to prioritize the tests from each queue so that no job is delayed too much?
Thanks.
Adding information following Jim's comments.
Not enough information to supply an answer. Is a job essentially just a list of tests? Can multiple tests for a single job be run concurrently? Do you always run all tests for a job? – Jim Mischel 14 hours ago
Each job deploys between 10 to 1000 tests.
The test can run concurrently to all other tests from the same or other users without conflicts.
All tests that were deploy by a job, are planned to run.
Additional info:
I've learned so far that Prioritized Queues are actually about applying weights to items in a single queue, where items with the hightest are pulled first. If two or more items have the same highest priority, the first item to arrive will be executed first.
When I pondered about Priority Queues it was more in the way of:
Multiple Queues, where each queue has a priority assigned to the entire queue.
The priority can be changed dynamically in runtime, based on some condition, e.g. setting a time limit on the execution of the entire queue.

How can I create a Scheduled Task that will run every Second in MarkLogic?

MarkLogic Scheduled Tasks cannot be configured to run at an interval less than a minute.
Is there any way I can execute an XQuery module at an interval of 1 second?
NOTE:
Considering the situation where the Task Server is fully loaded and I need to make sure that the secondly scheduled task gets the Task Server thread whenever it needs.
Please let me know if there is anything in MarkLogic that can be used to achieve this.
Wanting rapid-fire scheduled tasks may be a hint that the design needs rethinking.
Even running a task once a minute can be risky, and needs careful thought to manage the possibilities of overlapping tasks and runaway tasks. If the application design calls for a scheduled task to run once a second, I would raise that as a potentially serious problem. Back up a few steps, and if necessary ask a new question about the higher-level problem that led to looking at scheduled tasks.
There was a sub-question about managing queue priority for tasks. Task priorities can handle some of that. There are two priorities: normal and higher. The Task Server empties the higher-priority queue first, then the normal queue. But each queue is still a simple queue, and there's no way to change priorities after a task has been spawned. So if you always queue tasks with priority=higher, then they'll all be in the higher priority queue and they'll all run in order. You can play some games with techniques like using server fields as signals to already-running tasks. But wanting to reorder tasks within a queue could be another hint that the design needs rethinking.
If, after careful thought about all the pitfalls and dangers, I decided I needed a rapid-fire task of some kind.... I would probably do it using external requests. Pick any scripting language and write a simple while loop with an HTTP request to the MarkLogic cluster. Even so, spend some time thinking about overlapping requests and locking. What happens if the request times out on the client side? Will it keep running on the server? Will that lead to overlapping requests and require deadlock resolution? Could it lead to runaway resource consumption?
Avoid any ideas that use xdmp:sleep. That will tie up a Task Server thread during the sleep period, and then you'll have two problems.

Activiti Rest - Calling multiple instances concurrently

I have defined some simple BPM flows (F1) and deployed in activiti-rest.war. For simplicity, I have take a simple start-end flow.
I have written a REST client to execute the flow (F1) in parallel threads (20) with its required parameters for 1000 http requests.
Problem: I can see the flows are running sequentially, one by one response for the 20 parallel threads. It took a time of around 60 secs to complete with 20 threads (even when increased to 50 threads) it is the same.
Activiti Version : 5.15
What should be the problem here ?. Any help will be really useful.
activiti-rest/service/runtime/process-instances - Rest URL used to start the instance
Thanks,
Yoka
At last i found the solution.
It could be of two reasons
1) Make sure task's "Exclusive" property is set to false. But it needs more analysis on how your process task will be running. Refer the below link for further information
http://www.activiti.org/userguide/#exclusiveJobs
2) If you run the activity rest application and the client process on a dual-core machine. It might be difficult to assess the response time.
Thanks,
Yoka

job, task and process, what's the difference

what is the difference between these concepts?
“Process” is well-defined; “job” and “task” are ambiguous.
Fundamentally a job/task is what work is done, while a process is how it is done, usually anthropomorphised as who does it. A job is an overall unit of work, and is composed of tasks. In practice usage is very inconsistent, and often “task” == “process”, though formally a process performs a task.
Process is a well-defined operating systems concept, as is thread: a process is an instance of a program that is being executed, and is the basic unit of resources: a process consists of or “owns” its image, execution context, memory, files, etc.; etymologically a process is the steps done by a processor. A process consists of one or more threads, which are the unit of scheduling, and consist of some subset of a process (possibly shared with other threads): execution context and perhaps more. Traditionally a thread is the unit of execution on a processor (a thread is “what is executing”), but with multi-core processors and hardware threads, some scheduling is done even at the level of a single core. There are various kinds of processes and threads, and the exact definition varies between platforms.
Job and task are today vague, ambiguous terms, especially task. A “job” often means a set of processes, while a “task” may mean a process, a thread, a process or thread, or, distinctly, a unit of work done by a process or thread.
To give an idea how confused the naming is,
Windows Task Manager manages (running) processes, while
Windows Task Scheduler schedules programs to execute in future, what is traditionally known as a job scheduler, and uses the .job extension!
The term “job” traditionally means a “piece of work” (as opposed to “occupation”), and is used as such in manufacturing, in the phrase “job production”, meaning “custom production”, where it is contrasted with batch production (many items at once, one step at a time) and flow production (many items at once, all steps at the same time, by item). Note that these distinctions have become blurred in computing, notably in the oxymoronic term “batch job”.
In computing, “job” originates in non-interactive processing on mainframes, notably in IBM’s Job Control Language for the DOS/360 and OS/360 of the mid-1960s, and formally means a “unit of work for an operating system”, which consists of steps, each of which is a request to execute a specific program. Early computers primarily did batch processing (running the same program over many input data), like census or billing, and a standard type of one-off job was compiling a program from source, which could then process batches of data. Later batch came to be applied to all non-interactive computing, whether one-off or multiple items.
In Unix shells, a “job” is the shell’s representation for a process group – a set of processes that can all be sent a signal – concretely a pipeline and its descendent processes; note that running a script starts a job, exactly as in mainframes. The job is not done until the processes complete, and a job can be stopped, resumed, or terminated, which corresponds to suspending, resuming, or terminating the processes. Thus while formally a job is distinct from the process group, this is a subtle distinction and thus people often use “job” to mean “set of processes”.
Traditional jobs (and batches) have finite input data and should complete processing, successfully or not. By contrast, when running a server, such as a web server, the input, such as a stream of requests, is unlimited (formally codata). This is analogous to flow production, and the process (or “job”) never completes, though it can be terminated or “canceled”. In a quip, “a server’s job is never done” (formally, exit status will be CANCELED, not COMPLETED/SUCCESS).
The term “step” makes sense for sequential computing – one step follows another – but once you have concurrent computing, you have a set of tasks, which do not necessarily run in a particular order, rather than a sequence of steps. The term “task” was popularized by OS/360, which featured “Multiprogramming with a Fixed number of Tasks (MFT)” and “Multiprogramming with a Variable number of Tasks (MVT)”, though in this case “task” was used synonymously with “process” or “thread”, as the basic task is “execute this program” (so the resulting process/thread performs the task), which is probably the source of the ambiguity.
Formally “multitasking” means “working on multiple tasks concurrently”, but in practice means an operating system (or virtual machine, or runtime, or individual process) “running multiple processes/threads concurrently”.
A clear distinction between tasks as work and process/threads as how the work is done is given in a
task queue, as in this diagram of a thread pool: there is a (big, potentially unlimited) queue of incoming tasks (pending), which are performed by a (small, often fixed) set of threads, each task being performed by a single thread, and each thread performing a single task at a time: the active tasks correspond to the active threads. Concretely, consider a multithreaded web server, where the tasks are “service this web page request”, and each thread fetches (from disk or memory) or renders the web page (say by a template or PHP), then returns the result.
As you can see from this last example, it is often useful to distinguish tasks from threads or processes, and in particular contexts “job” and “task” have specific meanings, though in general they are ambiguous.
Clearest is thus to avoid using “job” or “task” and instead refer to a “set of processes”, “process”, or “thread”, and for servers to refer to requests (or queries) rather than tasks.
They can be all considered the same thing, really depends on the context. A process though is usually an isolated entity that's managed by the operating system. A job is often more of an application level term or just some script that's executed to do a specific set of task(s). A task is often a part of a job - sometimes the only part.
A job is a unit of work that has been submitted by user. It is usually associated with batch systems. A batch job might be a request to run multiple programs in succession [pg 144]. However, it can be assumed that a job is a request to run a single program. Hence, depending on the context, a job can be a program (we usually assume this), or a set of programs (e.g. batch systems) [pg 8].
A process is an active entity, which requires a set of resources, including a processor and special registers to perform its function. It is a single instance of an executable program. So from here, you can see the connection between a process and a program, hence, a job.
The Linux kernel internally represents processes as tasks [pg 742].
Source: Modern Operating Systems (3rd edition) by Tanenbaum, published by Pearson Education, Inc, 2009
A task represents the execution of a single process or multiple processes on a compute node. A collection of tasks that is used to perform a computation is known as a job. Jobs are used to reserve the resources required by tasks.
source: jobs and tasks http://msdn.microsoft.com/en-us/library/bb525214%28v=vs.85%29.aspx
Well...
This might not be as clear as described here. It may very well depend of the operating system some one is dealing with.
For example when compiling a DIGITAL Equipment OSF1 kernel (also known as TruUnix64) -- when that Unix was still existant, end of the nineties, beginning of the century -- the term TASK was dedicated to the number of parallel tasks the kernel was able to handle.
It was a fixed array of tasks the kernel could perform at a given moment.
Thus it was the sum of the processes it could spawn as well as internal tasks it has to do even if not seen as processes by ps. Then it was a very low level count of actions allowed to the kernel on each NUMA node, not something accessible outside the kernel.
On the other hand a previous operating system like DEC VMS was known for having its base OS unit as a job (you interactively logged under a job) executing possibly (depending on system and account parameters and privileges) many processes at a time. An image (an executable) then occupying a process and (most of the time) multiple threads (the OS took care of multithreading by itself) at a time.
So, then, the job was not application related but really OS related.
Somewhat similarly Windows, which does not natively support fork() as a lightweight process creator, tends to create processes (using a spawn - CreateProcess - primitive that looks very much alike the one that existed onto VMS / OpenVMS 40 years ago) that are heavier that the Unix ones. Here, we have the same word (process) to describe (in term of OS) two realities that are quite different: a Windows process tends to be closer to a VMS job than a true Unix process.
As I did not configure/build any Unix Kernel since TrueUnix64, I am not able to discuss the TASK kernel parameter of a Debian or Linux OS if any. It might be interesting that someone with inner knowledge of the tasks limit of those kind of OS could explain us further on this concept in these systems.
To conclude: task, process, job, spawn, fork, thread... the more you dig into different OS, the more varieties you get and possible contradictory definitions you face.
Gilles
[non native English speaker, pardon my English].

Does it make sense to use a pool of Actors?

I'm just learning, and really liking, the Actor pattern. I'm using Scala right now, but I'm interested in the architectural style in general, as it's used in Scala, Erlang, Groovy, etc.
The case I'm thinking of is where I need to do things concurrently, such as, let's say "run a job".
With threading, I would create a thread pool and a blocking queue, and have each thread poll the blocking queue, and process jobs as they came in and out of the queue.
With actors, what's the best way to handle this? Does it make sense to create a pool of actors, and somehow send messages to them containing or the jobs? Maybe with a "coordinator" actor?
Note: An aspect of the case which I forgot to mention was: what if I want to constrain the number of jobs my app will process concurrently? Maybe with a config setting? I was thinking that a pool might make it easy to do this.
Thanks!
A pool is a mechanism you use when the cost of creating and tearing down a resource is high. In Erlang this is not the case so you should not maintain a pool.
You should spawn processes as you need them and destroy them when you have finished with them.
Sometimes, it makes sense to limit how many working processes you have operating concurrently on a large task list, as the task the process is spawned to complete involve resource allocations. At the very least processes use up memory, but they could also keep open files and/or sockets which tend to be limited to only thousands and fail miserably and unpredictable once you run out.
To have a pull-driven task pool, one can spawn N linked processes that ask for a task, and one hand them a function they can spawn_monitor. As soon as the monitored process has ended, they come back for the next task. Specific needs drive the details, but that is the outline of one approach.
The reason I would let each task spawn a new process is that processes do have some state and it is nice to start off a clean slate. It's a common fine-tuning to set the min-heap size of processes adjusted to minimize the number of GCs needed during its lifetime. It is also a very efficient garbage collection to free all memory for a process and start on a new one for the next task.
Does it feel weird to use twice the number of processes like that? It's a feeling you need to overcome in Erlang programming.
There is no best way for all cases. The decision depends on the number, duration, arrival, and required completion time of the jobs.
The most obvious difference between just spawning off actors, and using pools is that in the former case your jobs will be finished nearly at the same time, while in the latter case completion times will be spread in time. The average completion time will be the same though.
The advantage of using actors is the simplicity on coding, as it requires no extra handling. The trade-off is that your actors will be competing for your CPU cores. You will not be able to have more parallel jobs than CPU cores (or HT's, whatever), no matter what programming paradigm you use.
As an example, imagine that you need to execute 100'000 jobs, each taking one minute, and the results are due next month. You have four cores. Would you spawn off 100'000 actors having each compete over the resources for a month, or would you just queue your jobs up, and have execute four at a time?
As a counterexample, imagine a web server running on the same machine. If you have five requests, would you prefer to serve four users in T time, and one in 2T, or serve all five in 1.2T time ?