Qlik Sense: Change date field format from Google Analytics API - date

I've pulled in data in Qlik Sense (cloud) from the Google Analytics connector. I'm trying to convert the standard date [ga_dateHourMinute] field to a more eligible date format.
The current format is YearMonthDayhHourMinute, for instance: 201810250004, I would like to convert this to the standard date format 2018-10-25 00:04:00. How do I do this? Answers concerning methods in the data load script or master formula's or variables are all welcome.
Click to see screenshot: left = current date format and right = desired date format

This is one approach:
DateAlter:
LOAD * INLINE [
Date
201810250004
];
DateAlter2:
LOAD
Date(Date#([Date], 'YYYYMMDDhhmm') ,'YYYY-MM-DD hh:mm') AS [MyDateField]
Resident
DateAlter;
If you haven't played around with the data manager, it will allow you to edit fields and handle dates in a fairly easy manner:
Qlik Sense Data Manager

I ended up creating a text fields that combined the different digits from the one field into a new order, then pushed the data format into a date/time. Quite a bit of work, but fairly solid.

Related

Importing Dates/Time from Excel to a Sharepoint list using Power Automate

I'm hoping somebody can shed some light on this issue. I am trying to build a flow that adds new entries/updates existing entries in a SP list based on an Excel Spreadsheet stored on OneDrive. The spreadsheet contains both columns with dates and date & time.
I've researched this extensively, trying to get the dates properly transferred into SP. The common solution is to use an expression AddDays (for dates) and AddSeconds (for time), as per tutorials here and here.
However, these methods require the dates and time to be passed as numerical values (integers and float respectively) from Excel. It appears that the Excel Online connector only passes those values as string. As discussed in this thread, this used to work with the standard Excel connector, but this connector got deprecated. I'm hoping somebody has a workaround or solution. Thank you!
Update: As the SP list expects the date time as string, I've also tried to convert the dates & time columns to text in Excel, using the Text function. It worked for transferring the dates, but the time values are inconsistent.
Declare two variables
StringDate Type: String
StrToInt Type: Integer
Now set "StringDate" to your Excel value. (Please keep in mind I am using an Apply to Each to get the Excel value)
Now convert "StringDate" to an integer with "
StrToInt" and Decrement "StrToInt" by 1.
#{int(variables('StringDate'))}
Now add the integer to SharePoint and convert it to a date.
#{addDays('1899-12-31',int(variables('StrToInt')),'yyyy-MM-dd')}

Why am I getting iso 8601 dates from my Postgres database?

I'm using Seekwell to connect my AWS postgres database to Sheets.
I think I'm converting my dates to standard 'date' (YYYY-MM-DD) format in the code, eg.
date(date_trunc('day', u.created_at::date)) Date_Created
However, when the query is run, my dates are iso 8601, eg.
2018-05-16T00:00:00.000Z
Of course, given that my results are going into Google Sheets, I can always convert those dates there in sheets, but that adds a layer of complexity that is hard to manage.
How can I make sure the dates are formatted correctly before the results land in sheets?
Michael from Seekwell tells me this is:
a bit of bug with how JDBC handles dates in the background. You're on Postgres, right? This should work from within the add-on:
to_char(your_date_column, 'YYYY-MM-DD')
Sheets will recognize that result as a date.
This worked.

Date Format in Power BI Hierarchical Slicer

I have a Power BI file that connects to a data model via SSAS. The data model origin is a SQL Server view with some computed columns added in via SSAS.
One of the visualisations is a Hierarchical Slicer that shows dates. The field is not one of the computed SSAS columns. It displays in DD/MM/YYYY format but when I place the file on a Power BI Report Server the format is Americanised to MM/DD/YYYY. I want it to be DD/MM/YYYY.
The same field is used to populate a table visualisation but in there it remains DD/MM/YYYY. Just the slicer is affected.
This blog https://community.powerbi.com/t5/Desktop/date-format-in-slicer/td-p/215627 seemed to have the answer I needed but these settings were already applied and still the slicer shows MM/DD/YYYY.
Its not a problem when I open the pbix file locally; there, the slicer shows the dates as DD/MM/YYYY, its just when its on the server. The same problem persists in Test and Production and I have checked those settings and they are as the blog indicates. Other blogs identify this with the slicers but do not present a real solution as its not seen as a problem in those topics.
I've only spent a month working with Power BI so have no real experience to draw upon. I know that SQL Server defaults to American English when connecting to a database and I have changed that to British English but still the same problem. How do I get the slicer showing as DD/MM/YYYY as in my local copy?
Select the Date column and then go to the Modeling tab and change Format to whatever Date format you want.
OR
You can create a calculated column using the FORMAT method in DAX to convert date format as you want.
See reference here: https://msdn.microsoft.com/en-us/library/ee634398.aspx
Power BI is missing the formatting in their recent releases. However, the below solution works for me:
Create a Calculated Column ref. the original Date column and apply "Short Date" format for Date, example:
Transaction Date =
FORMAT(DATE(
YEAR([Transaction_Date]),
MONTH([Transaction_Date]),
DAY([Transaction_Date])
), "Short Date")

Tableau String to Date Time Format Issues

I am pulling in date information via MySQL and the date is in the string format of "MM/dd/YY hh:mm:ss"
Using the built in conversion to date isnt working; so I tried using DATEPARSE and also using DATE and manually parsing it. I have had no luck and I have no idea why I keep getting "null" as the answer or it is putting the month as year, day as month, and year as day.
See screenshots below for the different formulas I have used:
DATEPARSE
Original date format
DATE with manual parsing
This worked for me using your example original data
DATEPARSE('mm/dd/yy hh:mm:ss',[Time] )
I used tableau's documentation of custom date formats to find the right formula for the format.
If this doesn't solve the problem then it is most likely due to a Locale issue. The Dateparse function relies on the locale specified by your computer settings to interpret and then display the strings you want to convert and can affect whether a certain format can be specified. This means that if a certain format is not recognised it will return a null. This will often occur is the windows region and language format is changed to another language other than the original language the workbook was created it.
So check your locale and if required execute the following workaround (documented by tableau here):
Open Windows control panel > region and language > format
Click format dropdown and change to original language of workbook creation
click ok or apply and reopen tableau work book

IBM i (AS400/ISeries) - Adding days to date field in WRKQRY

I have a decimal date field (TDDATR) that is in the YYYYMMDD format.
I would like to create a field that is TDDATR + 30 days but I am unable to.
Using 'Define Results Field' I have tried a few things;
Simply doing this;
TDDATR + 30 DAYS
But it returned this error: Labeled duration not used correctly.
I tried using the DIGITS and SUBSTR commands to create a field in the DDMMYYYY format and then +30 days but got the same error.
Same as above but in the DD/MM/YYYY format - same error.
Using DATE(TDDATR) but all I see is +'s in the field.
Using DATE( ) on the fields created in step 2 and 3 - still get +'s
I've ran out of ideas - any help would be greatly appreciated.
Query/400 lacks a lot of the features that an SQL based interface has.
I'd urge you to consider switching to Query Manager (STRQM) which is a fully SQL based product. You can even convert Query/400 queries to Query Manager queries with the RTVQMQRY command by having the ALWQRYDFN parm set to *YES.
The other option that IBM is pushing is Web Query. Again, fully SQL based and you can convert Query/400 queries into it.
Having said that, the problem is that FLD + 30 DAYS only works when FLD is a DATE data type. Query/400 includes a DATE() function to convert non-date types into date. But it's very limited in that it only works with character fields formatted according to your job defaults. Assuming you're in the US, it'd only work with a character value of '07/01/15'.
You could do a lot of manipulation in Query/400 and end up with a result field that meets DATE()'s requirements. But a better solution would be to create an SQL view over your table and have your numeric date converted into a date data type in the view.
You can find code examples that show how to convert a numeric YYYYMMDD to a actual date data type in the view. However, I'd recommend create a user defined function (UDF) that will do the conversion for you. That will make it much easier to use in the view and to reuse in other places.
If you'd like, there's an open source package called iDate, that includes all the code required for convert to/from date data types.
Download that, install/compile it and your SQL view becomes
select ... idate(TDDATR,'*CCYMD') as TD_DATE
from myfile
The use of days is as follow
Field Expression
CURDATE_30 days(current(date)) + 30
The solution to your problem is: given the field A dec(8,0)
Field Expression
YYYYMMDD_ date(substr(digits(a),5,2)||'/'||
substr(digits(a),7,2)||'/'||
substr(digits(a),3,2))
NEXT_MONTH DAYS(YYYYMMDD_) + 30
Remember to check the date format in your job description. In the example the format is MDY or MM/DD/YY.
More info here
Based on the information here, I created the below 2 fields;
TDDIGI DIGITS(TDDATR)
TDDAT1 SUBSTR(TDDIGI,7,2)||'/'||
SUBSTR(TDDIGI,5,2)||'/'||
SUBSTR(TDDIGI,3,2)
From here I was able to create a date field;
TDDAT2 DATE(TDDAT1)
Which allowed me to perform the necessary calculations.
The format of TDDAT1 is based on your job description which can be found by;
WRKJOB
Option 2
Page down
Date format..: X
Mine was *DMY, so TDDAT1 was formatted based on this.