OR-Tool - What is objectiveValue of Assignment model - or-tools

in this example the printSolution has the log:
logger.info("Objective : " + solution.objectiveValue());
So what does it mean the objectiveValue? how it is affect to solution found? also how to edit that value? the log output the number but i dont understand
Thanks

Basically, it will be the sum of arc cost used by the fleet.
This is the value, the routing solver will try to minimize as much as possible.
You should take a look at https://groups.google.com/g/or-tools-discuss/c/YCUNTmWr8Us/m/tA1OlIfVAQAJ to know how you can add more "value" to this objective.

Related

Is there way to customize col_max value without change python-click source code?

I'm facing a very concrete problem with python-click 8.1.3. The helptext created by Click wastes too much column space when an option name is a tad long. Depicted in picture below:
I trace into Click's source code, and pinpoint a hardcoded value in HelpFormatter.write_dl(), the col_max parameter determines first-column max-width, which is 30, and I hope to reduce it to 16.
As a Click-library user, how can I achieve this without modifying Click's source code? Maybe some class inheritance or patching trick?
Thank you in advance.
You can do something like this:
class MyHelpFormatter(click.HelpFormatter):
def write_dl(self, rows, col_max=5, col_spacing=2):
super().write_dl(rows, col_max, col_spacing)
click.Context.formatter_class = MyHelpFormatter
Check this answer for a similar example

GAMS: retrieve information from solution

GAMS: I think I have a pretty simple question, however I'm stuck and was wondering if someone could help here.
A simplified version of my model looks like this:
set(i,t) ;
parameter price
D;
variable p(i,t)
e(i,t);
equations
Equation1
obj.. C=sum((i,t), p(i,t)*price);
Model file /all/ ;
Solve file minimizing C using MIP ;
Display C.l;
p(i,t) and e(i,t) are related:
Equation1 .. e(i,t)=e=e(i,t-1)+p(i,t)*D
Now I want to retrieve information from the solution: lets say I want to know at what t e(i,t) has a certain value for example --> e(i,t)= x(i) or otherwise formulated e(i,t=TD)=x(i) find TD, where x(i) thus is depending on i. Does anyone know how I can write this in to my GAMs model? To be clear I do not want to change anything about my solution and the model I have runs; I just want to retrieve this information from the solution given.
So far I tried a couple of thing and nothing worked. I think that this must be simple, can anyone help? Thank you!
Try something like this:
set i /i1*i10/
t /t1*t10/;
variable e(i,t);
*some random dummy "solution"
e.l(i,t) = uniformInt(1,10);
set find5(i,t) 'find all combinations of i and t for which e.l=5';
find5(i,t)$(e.l(i,t)=5) = yes;
display e.l,find5;
Hope that helps,
Lutz

SAPUI5: set Timepicker configuration for 15 min interval

Is is possible to configure the sap.m.TimePicker to display only 15 minute intervals?
At the moment the user can enter any time they like.
It's possible now with version 1.40.+
There was incorrect information in the API documentation and it wasn't possible even on version 1.38
Change it to a DropDownBox with a value range of 00:00, 00:15, 00:30, ... 23:30, 23:45? This makes the limitation to specific intervals clear at a glance, is easy to implement and avoids entry of undesired values altogether.
While #vwegert 's answer is function I think there is a better way where you you still get the look and feel of the TimePicker.
In the source of the control there is a property minutesStep. If you can set this in the xml or js definition I think you could be onto a winner.
In fact there is a setter (yay) setMinutesStep.
oTimer.setMinutesStep(15); should be a winner for you.
Hope that helps,
Nigel

Retrieve Bloomberg Historical Data - API

From the below code, I was attempting to retrieve 250 observations rather than 177. The gap is due to the fact that the call only considers trading days which is fine to me.
s='SX5E INDEX';
f='LAST_PRICE'
t= datestr(today()-250,'mm/dd/yy');
T= datestr(today(),'mm/dd/yy');
[dt,~]=history(con,s,f,t,T)
However, is there a way of retrieving the last 250 observations from today(), whatever the starting date t is ?
Best
EDIT
#Daniel : Based on your suggestion, and Going forward with while loop, I've ended up with the below way around which is free from any Matlab default calendar setting. Thanks
while l~=p
n=p-l;
t=t-n;
[dt,~]=history(con,s,f,t,T);
l=length(dt);
end
Maybe my idea to use isbusday wasn't well explained in the comments. Here is what I would try:
n=250;
m=n;
while(sum(isbusday(today()-n:today()))<m)
missing=m-sum(isbusday(today()-n:today()));
n=n+missing;
end
Count the number of missing days, add the missing days and check again (in case you added a holiday)
You should end up with n the total number of days you have to query.
(Lacking the toolbox, I was unable to test the code)

COBOL add 0 to a Variable in COMPUTE

I ran into a strange statement when working on a COBOL program from $WORK.
We have a paragraph that is opening a cursor (from DB2), and the looping over it until it hits an EOT (in pseudo code):
... working storage ...
01 I PIC S9(9) COMP VALUE ZEROS.
01 WS-SUB PIC S9(4) COMP VALUE 0.
... code area ...
PARA-ONE.
PERFORM OPEN-CURSOR
PERFORM FETCH-CURSOR
PERFORM VARYING I FROM 1 BY 1 UNTIL SQLCODE = DB2EOT
do stuff here...
END-PERFORM
COMPUTE WS-SUB = I + 0
PERFORM CLOSE-CURSOR
... do another loop using WS-SUB ...
I'm wondering why that COMPUTE WS-SUB = I + 0 line is there. My understanding is that I will always at least be 1, because of the perform block above it (i.e., even if there is an EOT to start with, I will be set to one on that initial iteration).
Is that COMPUTE line even needed? Is it doing some implicit casting that I'm not aware of? Why would it be there? Why wouldn't you just MOVE I TO WS-SUB?
Call it stupid, but with some compilers (with the correct options in effect), given
01 SIGNED-NUMBER PIC S99 COMP-5 VALUE -1.
01 UNSIGNED-NUMBER PIC 99 COMP-5.
...
MOVE SIGNED-NUMBER TO UNSIGNED-NUMBER
DISPLAY UNSIGNED-NUMBER
results in: 255. But...
COMPUTE UNSIGNED-NUMBER = SIGNED-NUMBER + ZERO
results in: 1 (unsigned)
So to answer your question, this could be classified as a technique used cast signed numbers into unsigned numbers. However, in the code example you gave it makes no sense at all.
Note that the definition of "I" was (likely) coded by one programmer and of WS-SUB by another (naming is different, VALUE clause is different for same purpose).
Programmer 2 looks like "old school": PIC S9(4), signed and taking up all the digits which "fit" in a half-word. The S9(9) is probably "far over the top" as per range of possible values, but such things concern Programmer 1 not at all.
Probably Programmer 2 had concerns about using an S9(9) COMP for something requiring (perhaps many) fewer than 9999 "things". "I'll be 'efficient' without changing the existing code". It seems to me unlikely that the field was ever defined as unsigned.
A COMP/COMP-4 with nine digits does have a performance penalty when used for calculations. Try "ADD 1" to a 9(9) and a 9(8) and a 9(10) and compare the generated code. If you can have nine digits, define with 9(10), otherwise 9(8), if you need a fullword.
Programmer 2 knows something of this.
The COMPUTE with + 0 is probably deliberate. Why did Programmer 2 use the COMPUTE like that (the original question)?
Now it is going to get complicated.
There are two "types" of "binary" fields on the Mainframe: those which will contain values limited by the PICture clause (USAGE BINARY, COMP and COMP-4); those which contain values limited by the field size (USAGE COMP-5).
With BINARY/COMP/COMP-4, the size of the field is determined from the PICture, and so are the values that can be held. PIC 9(4) is a halfword, with a maxiumum value of 9999. PIC S9(4) a halfword with values -9999 through +9999.
With COMP-5 (Native Binary), the PICture just determines the size of the field, all the bits of the field are relevant for the value of the field. PIC 9(1) to 9(4) define halfwords, pic 9(5) to 9(9) define fullwords, and 9(10) to 9(18) define doublewords. PIC 9(1) can hold a maximum of 65535, S9(1) -32,768 through +32,767.
All well and good. Then there is compiler option TRUNC. This has three options. STD, the default, BIN and OPT.
BIN can be considered to have the most far-reaching affect. BIN makes BINARY/COMP/COMP-4 behave like COMP-5. Everything becomes, in effect, COMP-5. PICtures for binary fields are ignored, except in determining the size of the field (and, curiously, with ON SIZE ERROR, which "errors" when the maxima according to the PICture are exceeded). Native Binary, in IBM Enterprise Cobol, generates, in the main, though not exclusively, the "slowest" code. Truncation is to field size (halfword, fullword, doubleword).
STD, the default, is "standard" truncation. This truncates to "PICture". It is therefore a "decimal" truncation.
OPT is for "performance". With OPT, the compiler truncates in whatever way is the most "performant" for a particular "code sequence". This can mean intermediate values and final values may have "bits set" which are "outside of the range" of the PICture. However, when used as a source, a binary field will always only reflect the value specified by the PICture, even if there are "excess" bits set.
It is important when using OPT that all binary fields "conform to PICture" meaning that code must never rely on bits which are set outside the PICture definition.
Note: Even though OPT has been used, the OPTimizer (OPT(STD) or OPT(FULL)) can still provide further optimisations.
This is all well and good.
However, a "pickle" can readily ensue if you "mix" TRUNC options, or if the binary definition in a CALLing program is not the same as in the CALLed program. The "mix" can occur if modules within the same run-unit are compiled with different TRUNC options, or if a binary field on a file is written with one TRUNC option and later read with another.
Now, I suspect Programmer 2 encountered something like this: Either, with TRUNC(OPT) they noticed "excess bits" in a field and thought there was a need to deal with them, or, through the "mix" of options in a run-unit or "across file usage" they noticed "excess bits" where there would be a need to do something about it (which was to "remove the mix").
Programmer 2 developed the COMPUTE A = B + 0 to "deal" with a particular problem (perceived or actual) and then applied it generally to their work.
This is a "guess", or, better, a "rationalisation" which works with the known information.
It is a "fake" fix. There was either no problem (the normal way that TRUNC(OPT) works) or the correct resolution was "normalisation" of the TRUNC option across modules/file use.
I do not want loads of people now rushing off and putting COMPUTE A = B + 0 in their code. For a start, they don't know why they are doing it. For a continuation it is the wrong thing to do.
Of course, do not just remove the "+ 0" from any of these that you find. If there is a "mix" of TRUNCs, a program may stop "working".
There is one situation in which I have used "ADD ZERO" for a BINARY/COMP/COMP-4. This is in a "Mickey Mouse" program, a program with no purpose but to try something out. Here I've used it as a method to "trick" the optimizer, as otherwise the optimizer could see unchanging values so would generate code to use literal results as all values were known at compile time. (A perhaps "neater" and more flexible way to do this which I picked up from PhilinOxford, is to use ACCEPT for the field). This is not the case, for certain, with the code in question.
I wonder if a testing version of the sources ever had
COMPUTE WS-SUB = I + 0
ON SIZE ERROR
DISPLAY "WS-SUB overflow"
STOP RUN
END-COMPUTE
with the range test discarded when the developer was satisfied and cleaning up? MOVE doesn't allow declarative SIZE statements. That's as much of a reason as I could see. Or perhaps developer habit of using COMPUTE to move, as a subtle reminder to question the need for defensive code at every step? And perhaps not knowing, as Joe pointed out, the SIZE clause would be just as effective without the + 0? Or a maintainer struggled with off by one errors and there was a corrective change from 1 to 0 after testing?