I have a bunch of TSQL change scripts, all named appropriately in sequence.
I want to combine these into one big script with a few twists. I include a version number function in the script that I update for each script so that once change 1 is run it returns 1, once 2 is run it returns 2 and so on. This function remains in the database and always returns the version of the schema/database.
I want to wrap each change script with a few lines that prevent a script that has already been run from running again, likewise it should prevent a change script from running on a schema version that is too "low". This allows me to bunch all the change scripts into one, and only missing changescripts will be applied when it all runs.
This is all fine, but I cant find a way to make osql / Query Analyzer / Sql Server Studio skip the parts that have alreay been run.
GOTO won't work across batches (Scripts contain "GO")
IF BEGIN END won't work likewise because of GO
Update: To reiterate, I don't need help remembering the current version number, I need a way to skip parts of the script to prevent already applied updates from reapplying.
I have tried a number of methods:
I can wrap the batch in an db_executeSql statement or EXECUTE but this leads to scoping problems.
I can wrap each batch in a IF dbo.DB_VERSION()!=REQUIRED_VERSION THEN BEGIN .... END construct, but this is messy and makes handling errors difficult.
Encountering situations where the change should not be applied is expected and is not an exceptional situation. So simply RETURNing when not applicable is not Ok.
Any other suggestions?

You can keep the version number if a table, and use the function to check the value in the table and compare in an IF statement to the version of the change you wish to make.

Related

AZURE DATA FACTORY - Can I set a variable from within a CopyData task or by using the output?

I have simple pipeline that has a Copy activity to populate a table. That task is based on a query and will only ever return 1 row.
The problem I am having is that I want to reuse the value from one of the columns (batch number) to set a variable so that at the end of the pipeline I can use a Stored Procedure to log that the batch was processed. I would rather avoid running the query a second time in a lookup task so can I make use of the data already being returned?
I have tried duplicating the column in the Copy activity and then mapping that to something like #BatchNo but that fails and have even tried to add a Set Variable task but can't figure out how to take a single column #{activity('Populate Aleprstw').output} does not error but not sure what that will actually do in this case.
Thanks and sorry if its a silly question.
Cheers
Mark
I always do it like this:
Generate a batch number (usually with a proc)
Use a lookup to grab it into a variable
Use the batch number in all activities (might be multiple copes, procs etc.)
Write the batch completion
From your description it seems you have the batch embedded in the data copy from the start which is not typical.
If you must do it this way, is there really an issue with running a lookup again?
Copy activity doesn't return data like that, so you won't be able to capture the results that way. With this design, running the query again in a Lookup is the best option.
Is the query in the Source running on the same Server as the Sink? If so, you could collapse the entire operation into a Stored Procedure that returns the data point you are trying to capture.

Should mill tasks with non-file products produce something analogous to PathRef?

I'm using mill to build a pipeline that
cleans up a bunch of CSV files (producing new files)
loads them into a database
does more work in the database (create views, etc)
runs queries to extract some files.
Should the tasks associated with steps 2 and 3 be producing something analogous to PathRef? If so, what? They aren't producing a file on the disk but nevertheless should not be repeated unless the inputs change. Similarly, tasks associated with step 3 should run if tasks in step 2 are run again.
I see in the documentation for targets that you can return a case class and that re-evaluation depends on the .hashCode of the target's return value. But I'm not sure what to do with that information.
And a related question: Does mill hash the code in each task? It seems to be doing the right thing if I change the code for one task but not others.
A (cached) task in mill is re-run, when the build file (build.sc or it's dependencies/includes) or inputs/dependencies of that task change. Whenever you construct a PathRef, a checksum of the path content is calculated and used as hashCode. This makes it possible to detect changes and only act if anything has changed.
Of course there are exceptions, e.g. input tasks (created with T.input or T.sources) and commands (created with T.command) will always run.
It is in general a good idea to return something from a task. A simple String or Int will do, e.g. to show it in the shell with mill show myTask or post-process it later. Although I think a task running something in an external database should be implemented as a command or input task (which might check, when running, if it really needs something to do), you can also implement it as cached task. But please keep in mind, that the state will only be correct if no other process/user is changing the database in between.
That aside, You could return a current database schema/data version or a last change date in step 2. Make sure, it changes whenever the database was modified. Each change of that return value would trigger step 3 and other dependent tasks. (Of course, step 3 needs to depend on step 2.) As a bonus, you could return the same (previous/old) value in case you did not change the database, which would then avoid any later work in dependent tasks.

Is update order execution in unity constant?

Assuming two things:
1.- That there is no defined order for the Update() function execution and that If a specific order is needed, you can define it yourself with the script execution order as specified here, and here.
2.- That the gameobjects are not updated according to their hierarchy as explained here
Something I could not clear out from the documentation is if you do not set any order for the script execution, once this is set 'randomly' by unity, if this order remains unaltered through the execution of the game or if the update execution order may change in time.
If you do not specify anything, the order won't be consistent. If you want a specific script to execute before others you HAVE to use the script execution order or use an array has suggested in you linked post.

Can I debug a PostgreSQL query sent from an external source, that I can't edit?

I see how to debug queries stored as Functions in the database. But my problem is with an external QGIS plugin that connects to my Postgres 10.4 via network and does a complex query and calculations, and stores the results back into PostGIS tables:
FOR r IN c LOOP
SELECT
(1 - ST_LineLocatePoint(path.geom, ST_Intersection(r.geom, path.geom))) * ST_Length(path.geom)
INTO
station
(continues ...)
When it errors, it just returns that line number as the failing location, but no clue where it was in the loop through hundreds of features. (And any features it has processed are not stored to the output tables when it fails.) I totally don't know enough about the plugin and about SQL to hack the external query, and I suspect if it was a reasonable task the plugin author would have included more revealing debug messages.
So is there some way I could use pgAdmin4 (or anything) from the server side to watch the query process? Even being able to see if it fails the first time through the loop or later would help immensely. Knowing the loop count at failure would point me to the exact problem feature. Being able to see "station" or "r.geom" would make it even easier.
Perfectly fine if the process is miserably slow or interferes with other queries, I'm the only user on this server.
This is not actually a way to watch the RiverGIS query in action, but it is the best I have found. It extracts the failing ST_Intersects() call from the RiverGIS code and runs it under your control, where you can display any clues you want.
When you're totally mystified where the RiverGIS problem might be, run this SQL query:
SELECT
xs."XsecID" AS "XsecID",
xs."ReachID" AS "ReachID",
xs."Station" AS "Station",
xs."RiverCode" AS "RiverCode",
xs."ReachCode" AS "ReachCode",
ST_Intersection(xs.geom, riv.geom) AS "Fraction"
FROM
"<your project name>"."StreamCenterlines" AS riv,
"<your project name>"."XSCutLines" AS xs
WHERE
ST_Intersects(xs.geom, riv.geom)
ORDER BY xs."ReachID" ASC, xs."Station" DESC
Obviously replace <your project name> with the QGIS project name.
Also works for the BankLines step if you replace "StreamCenterlines" with "BankLines". Probably could be adapted to other situations where ST_Intersects() fails without a clue.
You'll get a listing with shorter geometry strings for good cross sections and double-length strings for bad ones. Probably need to widen your display column a lot to see this.
Works for me in pgAdmn4, or in QGIS3 -> Database -> DB Manager -> (click the wrench icon). You could select only bad lines, but I find the background info helpful.

Explain the steps for db2-cobol's execution process if both are db2 -cobol programs

How to run two sub programs from a main program if both are db2-cobol programs?
My main program named 'Mainpgm1', which is calling my subprograms named 'subpgm1' and 'subpgm2' which are a called programs and I preferred static call only.
Actually, I am now using a statement called package instead of a plan and one member, both in 'db2bind'(bind program) along with one dbrmlib which is having a dsn name.
The main problem is that What are the changes affected in 'db2bind' while I am binding both the db2-cobol programs.
Similarly, in the 'DB2RUN'(run program) too.
Each program (or subprogram) that contains SQL needs to be pre-processed to create a DBRM. The DBRM is then bound into
a PLAN that is accessed by a LOAD module at run time to obtain the correct DB/2 access
paths for the SQL statements it contains.
You have gone from having all of your SQL in one program to several sub-programs. The basic process
remains the same - you need a PLAN to run the program.
DBA's often suggest that if you have several sub-programs containing SQL that you
create PACKAGES for them and then bind the PACKAGES into a PLAN. What was once a one
step process is now two:
Bind DBRM into a PACKAGE
Bind PACKAGES into a PLAN
What is the big deal with PACKAGES?
Suppose you have 50 sub-programs containing SQL. If you create
a DBRM for each of them and then bind all 50 into a PLAN, as a single operation, it is going
to take a lot of resources to build the PLAN because every SQL statement in every program needs
to be analyzed and access paths created for them. This isn't so bad when all 50 sub-programs are new
or have been changed. However, if you have a relatively stable system and want to change 1 sub-program you
end up reBINDing all 50 DBRMS to create the PLAN - even though 49 of the 50 have not changed and
will end up using exactly the same access paths. This isn't a very good apporach. It is analagous to compiling
all 50 sub-programs every time you make a change to any one of them.
However, if you create a PACKAGE for each sub-program, the PACKAGE is what takes the real work to build.
It contains all the access paths for its associated DBRM. Now if you change just 1 sub-program you
only have to rebuild its PACKAGE by rebinding a single DBRM into the PACKAGE collection and then reBIND the PLAN.
However, binding a set of PACKAGES (collection) into a PLAN
is a whole lot less resource intensive than binding all the DBRM's in the system.
Once you have a PLAN containing all of the access paths used in your program, just use it. It doesn't matter
if the SQL being executed is from subprogram1 or subprogram2. As long as you have associated the PLAN
to the LOAD that is being run it should all work out.
Every installation has its own naming conventions and standards for setting up PACKAGES, COLLECTIONS and
PLANS. You should review these with your Data Base Administrator before going much further.
Here is some background information concerning program preperation in a DB/2 environment:
Developing your Application