iReport line chart category label - charts

i'm using the Line Chart component to generate a chart based on the consumption of a building.
Imagine a possible chart based on the consumption of a building in a period of a month and a resolution of a day. It will have 30 points of consumption corresponding to 30 days.
The problem is with the category axis labels. With a considerable amount of points, the labels becomes unreadable. How can i just label some points?
My best regards

Don't use a "Line" chart. Instead use a "Time Series" chart.
It automatically handles the issues around charting all points but only labeling a readable number of them. It also handles problems created by data points that are not uniformly spaced.
EDIT: If your incoming data is a String instead of a Date, then you have extra work. Time Series charts expect Times (well, Dates). You'll need to cast your DateString into a real Date. But the work is small, and the benefits are large. Use a variable like this: new SimpleDateFormat("yyyy-MM-dd HH:mm:ss").parse($F{MyDateString}).

Use this code to generate a label on the line chart in JASPER report
else if(jasperChart.getChartType() == JRChart.CHART_TYPE_LINE) {
LineAndShapeRenderer line = (LineAndShapeRenderer) chart.getCategoryPlot().getRenderer();
line.setBaseItemLabelsVisible(Boolean.TRUE);
line.setBaseItemLabelGenerator((CategoryItemLabelGenerator) new StandardCategoryItemLabelGenerator());
}

Related

Power Bi Plot dataset with x-axis dates

I am working with a dataset with which I am creating a dashboard. My dataset is very simple, a first column of [yyyy-mm-dd-hh-mm], and a second column with many values.
I read in many threads and forum about the difficulty to plot dates on x-axis (including hours and minuts).
As reference I am using this dashboard built in PowerBi https://www.terna.it/it/sistema-elettrico/transparency-report/total-load .(Public data of Italian electric energy generation)
This is exactly the outcome I would like to obtain, but by now I cannot display the hours and minuts. I used their data to reproduce the dashboard.
I tried to switch from a "dates" x-axis to a "text" x-axis, but the result is not the same, and furthermore the plot does not occupy the whole page but I have to move to the right.
enter image description here
I really cannot understand how the linked dashboard was built.
Any idea?
I guess your problem is that you have been using Date Hierarchy on the x-Axis you instead of Date only.

Time Stack Chart with years as horizontal axis

I want to add a stacked chart but could not find a way to customize the time-axis.
Currently my x-axis refers to days, however, I search for a way to display years. Since I want a stacked chart that changes over time, I believe I need to use the 'Time Stack Chart' (see screenshot). I would also be happy with simply several stacked bars next to each other (each bar represents one year), but the 'Bar Chart' only supports one bar (I believe).
My model collects data from different sources on the last day of the year and then my chart should display this value for the year, categorized by source. I have tried with different data sets, both where the time is the horizontal value and where it is not.
When I use a dataset where one value is 'Years' (through the getYear() function) this works fine for plots, but not when I want to have a stacked chart (which by default depends on the time).
Is there a solution to this?
Please let me know if you need further information!
You need to go to the appearance part, time axis format, set it to yyyy. Also in the scale section, you need to change model time units to years.

Tableau add trend line to discrete data?

I have run into this more times then I like, and I think it will continuously haunt me. I am creating reports/dashboards that report monthly or yearly or weekly data. The dates come in with just the last day of the period. For example, now I am working 2019 monthly report that is a bar chart with a trend line. Took me about 15 minutes to make in excel. However, we are trying to move everything into Tableau for dashboards. Trend line is always grayed out when using discrete dates and sometimes when using continuous dates. The dates are in the format DD/MM/YYYY so I can convert them as continuous but that skews the spacing on the X-Axis. I have messed around to get it to work but it takes time. I am shocked that this very basic thing does not work when Excel has been able to do it for a very long time. Does anyone know of a good work around? I have tried calculated the trend line myself, but do not see how I can add in the y=mx+B line that is generated. I am debating creating a data set just for this, but that seems long and hard way for something that I would have expected out of the box. Below is some basic data, in Excel it takes about 1 minutes to create a line chart, click (+) add trend line and your done.
I was not able to deal with the skew of the X-Axis very well but playing with the date it started and setting the major tick marks to monthly got me close. Looking at the picture below you will see the tick marks are not in the center of the bars but close. As for the trend line, I added a Dual axis on the same data that was the sum of all shown fields with no division by the parts (this is a stack mark bar chart). Since this is a basic line chart with continuous dates, a trend line is a simple click. I then removed the Tick Markets and set the opacity to 0% making the line invisible. I did not change the trend line so now that is all you can see. Seems like a long and hard way to do it, but it works. (UPDATE) Better fix, NEVER USE EOM always use First of Month.

Cognos Chart with "No Data Available" although list shows data

I am completely new to Cognos, so sorry if I don't state some necessary information. I can't go into specifics about my chart, but here is the background:
I have a SQL code running into my Query
My chart and list use the same Query and have the exact same fields
My chart is a basic line graph
When I change my aggregate function to total for my y-axis, then I can see the data points
I do not want to use an aggregate function (I need to see all the points for my x and y-axis)
My x-axis is only one object, but it has multiple y-axis values within a year (which is my series). Ex:product-cost-year list,
where my product is the x-axis, cost is the y-axis, and series is year.
How can I get my chart to appear with all my data points? Eventually, I would like to add an upper and lower confidence interval to this chart.
One way to solve this issue is to create another column that simply counts the number of products (1,2,3,...9). We will call this column count. Keep all your fields the same (product for x-axis, cost for y-axis, and year for series). You will want to add count underneath product on the x-axis. You should see your mouse pointer turn to a horizontal line and it will place it under and to the right of product. Make sure not to place it just to the right of product.

GANTT Chart with Shapes

I'm trying to create something like a GANTT Chart where I would have start dates and end dates designated by a shape like a diamond and then the period of time in between connecting the start and end date shown as a line connecting the shapes. Does anyone have any tips on how to do that in tableau?
For data I have an identifier column, an event column, a date column, a start date column, and an end date column.
To make a basic Ghantt chart in Tableau, put the start date on the column shelf, convert it to continuous exact date. Put the identifier on the row shelf and change the mark type to Ghantt. This should get a short bar at the start date of each task, with a row per task (assuming the ids are unique per task).
Now you need to specify how long the bars should be by putting a field showing the number of days for each task on the size shelf. You can create a calculated field to compute those durations as datediff('day', contract_start, contract_end). Place that on the size shelf and you should be off to a decent start.
You can add more info to the tool tips and use color to show contract type or something else. add some reference lines by right clicking on the axis. You will need some tweaks in the calculated field to deal with things like null (unknown) end dates, maybe recurring tasks ...
If you want a few milestone markers, you can use reference lines or point annotations to add them by hand easily.
Or if you want to include milestones as shapes with your data, you can use a dual axis chart.
Here is an example showing how to combine shapes and bars into one char. The details vary slightly depending on how your data is organized, but if you examine how the data for this workbook is organized, how the data connection joins the tabs, and how the workbook displays the data, you should be able to adapt the approach to your own data. Just realize sometimes it is easier to revise the way your data is shaped to make the analysis simpler.
Also, you might want to consider if you need both planned and actual dates.
See also
Gantt over time with summed bar