I had a quick question about the workflow plugin. I'm trying to see if the plugin will be able to satisfy my use case:
We have a jenkins job that will build our app
We want to spin off a suite of test jobs that will perform various tests on the newly built app (unit, integration, etc). These will need to be run in parallel and we want to run them on more than one jenkins node for performance reasons
We'll take the aggregated output from all our test processes from step 2 and be able to decide whether or not we should deploy (everything's passed) or not
I was curious as to whether or not I'd be able to accomplish this within the plugin and if so if you had any tips/pointers to a start.
Thanks!

You can certainly run nodes inside parallel branches. If one branch fails, the parallel step as a whole fails. If you want the build to succeed, but behave differently depending on test results, you can capture them directly as Groovy variables in various ways.
If you are using JUnitArchiver, currently it does not provide a simple means of exposing the test results directly to the Pipeline script (JENKINS-26276), though if you just want to tell if there are some failures or none, you can inspect currentBuild.status.
If you have JUnit-format test results and wish to automatically split them amongst various nodes (especially helpful in case you have a large pool of machines and it would be unmaintainable to manually divide your tests), see this demo of the Parallel Test Executor plugin’s splitTests step.

Related

How to have playwright workers execute separate logical paths in an NUnit test?

I have a Playwright test which I'm running via the following command -
dotnet test -- NUnit.NumberOfTestWorkers=2
From what I can gather, this will execute the same test in parallel with 2 workers. I'm curious if there's any way to have each worker go down a separate logical path, perhaps depending upon a worker id or something similar? Eg:
if (workerId == 1)
//do something
else if (workerId == 2) //do something else
What would be the best way to do this?
As to why I want this, I have a Blazor Server app which is a chat room, and I want to test the text updating from separate users (which would be represented by different worker ids, for example). I'd also like the solution to be scalable, eg: I can enter 5000 or so workers to test large scalability in the chat room.
You appear to have misunderstood what the NumberOfTestWorkers setting does. It simply tells NUnit how many separate test workers to set up. It does not have any impact on how NUnit allocates tests among it's workers, when running in parallel. And it does not cause an individual test to run more than once.
In general, the kind of load testing you are trying to do isn't directly supported by NUnit. You would have to build something of your own, possibly using NUnit or try a framework intended for that kind of testing.
A long time ago, there was something called pnunit, but I don't believe it is kept up to date any longer. See https://docs.plasticscm.com/technical-articles/pnunit-parallel-nunit

Are Dart/Flutter tests executed synchronously or asynchronously

could someone explain please how Flutter/Dart tests are executed using test runner?
Are the tests executed synchronously or asynchronously?
Does the testing framework execute every single test synchronously, meaning that only a single test and test suite is executed at any single time?
Or does the testing framework only execute a single test at a time within a test suite, but are able to execute multiple test suites at the same time?
Or testing framework run all tests and test suites completely independent of each other at the same time, completely asynchronously?
This is important because it has a direct impact on the way we are or aren't able to structure our tests, especially when it comes to the set up and tear downs of tests, and the way we assert functionality is working correctly.
Thanks!
In general, dart test will execute many tests in parallel (the parallelism level varies based on CPU core count), but you can disable this with a command line flag.
You should not write tests with any inter-dependence (i.e. one test should not rely on some global state set up by another test). For example, you may find that because your laptop has a different CPU configuration to your CI server, your tests might pass locally but fail in CI due to different ordering.
If you have some setup logic that is very expensive, and needs to be reused between multiple tests, you can use setUpAll() to run some code once before every test in a test group, however this is still discouraged. Personally, I prefer to just join the tests into one long test, to keep all tests self-contained.
This has some advantages. For example, you can use --total-shards and --shard-index to parallelize tests in CI (by creating multiple jobs to each run a different subset of the test suite).
You can also randomize the order of your tests with --test-randomize-ordering-seed, to make sure you aren't accidentally setting up such dependences between tests that might invalidate their results (i.e. perhaps test2 only passes if it happens after test1, randomizing the ordering will catch this).
TLDR
Many tests run in parallel. Try to keep tests self-contained, with no dependence on the order of tests. Extract setup logic into functions and pass it into setUp. If you really really need the performance, you can try setUpAll but avoid it if possible.

Azure Devops Regression test case management

We have a very large application with nearly 2K testcases for regression. Our process is multiple sprints of work towards a single release. So, we use a dedicated regression test plan.
My question is how to manage regression runs? Right now, we clone the Master Regression suite or prior regression suite. This allows us to preserve the previous regression results. But this method creates new unique test cases, which doesn't keep associated bugs.
If we reset all the tests in the current suite, I know the previous runs could be seen at the test case level. However, I can't figure out how to call up historical aggregate results, for a previous run.
How should DevOps be used for managing repeat test runs?
How should DevOps be used for managing repeat test runs?
To repeat test, we could to insert parameters in test steps:
Create a parameter by typing a name preceded by "#" in the actions and expected results of test steps
You could check this document Repeat a test with different data for some more details.
For the historical aggregate results, there is an user voice about it on the Developer Community.
Hope this helps.

Run a single job in parallel

I need to know that how can we run a single job in parallel with different parameters in talend.
The answer is straightforward, but rather depends on what you want, and whether you are using free Talend or commercial.
As far as parameters go, make sure that your jobs are using context variables - this is the preferred way of passing parameters in.
As for running in parallel, there are a few options.
Talend's studio is a java code generator, so you can export your job (it's just java code) and run it wherever you want. How you invoke it is up to you - schedule it, invoke it N times manually, your call. Obviously, if your job touches shared resources then making it safe to run in parallel is up to you - the usual concurrency issues apply.
If you have the commercial product, then you can use the Talend admin centre (TAC). The TAC allows you to schedule a job more than once with different contexts. Or, if you want to keep the parallelization logic inside your job, then consider using the tParallelize component in one job to run another job N times.

How do I set up a multi-stage test pipeline in sbt?

Specifically, for a Scalatra project, but the question probably applies to most.
For example, I typically want to run:
unit tests
code quality checks (coverage, duplication, complexity, jsLint!)
integration tests (not too many!)
acceptance tests (usually a "pre-checkin" subset)
regression tests (basically the same as acceptance tests, but a bigger set)
performance tests
I want to run different subsets of these by context - i.e. after a simple code change I might just run the first three; before checking in I might want to run a bigger set, and the Continuous Integration server might have a "fast" and a "slow" build that have even bigger sets.
The basic sbt docs seem to assume a single "test" target - is there a recommended way to implement multiple test phases like this?
You may want to look at this blog about using integrated testing with SBT and Hudson:
http://henkelmann.eu/2010/11/14/sbt_hudson_with_test_integration
Then, to add your own actions you can use this page:
http://code.google.com/p/simple-build-tool/wiki/CustomActions
Basically, though, you will probably want to add a new action for each of your testing steps, in order to get the particular events you want to happen.