OrientDB OR evaluation - orientdb

I'd like to take advantage of short circuiting the OR in an Orient's SQL query I'm writing. Does Orient's OR short circuit and does it evaluate its terms from left to right or right to left?

OrientDB WHERE condition evaluation is not completely executed as it's written, so you cannot rely 100% on OR operations short circuit.
In V 2.2 the execution planner tries to do some simple assumptions and evaluate indexed conditions first, then it will evaluate expressions from left to right.
In next V 3.0 the execution planner is much more complex and can do a complete rewriting of the WHERE condition to make the query more efficient, so you should not rely on short circuit in general

Related

When to use noEvent operator in Modelica language?

The noEvent operator in Modelica doesn't use iteration to find the precise time instant in which the event was triggered.
It seems this would cause calculation error, here is an example I find on the following website
https://mbe.modelica.university/behavior/discrete/decay/
So Do I have to ensure the function is smooth when using noEvent operator?
What's the purpose of using noEvent operator if it can't ensure accuracy?
Although the question is already answered I would like to add some points, as I think it could be useful for many.
There are some common reasons to use the noEvent() statement:
Guarding expressions: This is used to prevent a function from being evaluated outside of their validity range. A typical example is der(x) = if x>=0 then sqrt(x) else 0; which would work perfectly in most common programming languages. This doesn't work always in Modelica for the following reason: When searching for the time when the condition x>=0 becomes false, it is possible that both branches are evaluated with values of x varying around 0. The same fact is mentioned in the screenshot posted by marvel This results in a crash if the square root of a negative x is evaluated. Therefore der(x) = if noEvent(x>=0) then -sqrt(x) else 0; Is used to suppress the iteration to search for the crossing time, leaving the handling of the discontinuity to the solver (often referred to as "expressions are taken literally instead of generating crossing functions"). In case of a variable step-size solver being used, this makes the solver reduce the step-size to meet it's relative error tolerance, which will likely result in degraded performance. Additionally this can be critical if the function described is not smooth enough resulting in non-precise or even instable simulations.
Continuous Expressions: When a function is continuous there is actually no event necessary. This comes down to the fact, that events are used to describe discontinuities. So if there is none, usually the event is simply superfluous and can therefore be suppressed. This is actually covered by the smooth() operator in Modelica, but the specification says, that a tool is free to still generate events. To my experience, tools generate events if the change to the function is relatively big. Therefore it can make sense to have a noEvent() within a smooth().
Avoid chattering: noEvent can help here but actually chattering is a more general problem. Therefore I'd recommend to solve issues related to chattering by re-building the model.
If none of the above is true the use of noEvent should be considered carefully.
I think the Modelica Language Specification Version 3.4 Section 3.7.3.2. and Section 8.5. will help you out here (in case you have not already checked this).
From what i know it should only be used for efficiency reasons and in most cases one should use smooth() instead or in conjunction.
Based on the two different ways of dealing with the event. If using noEvent operator, there is no halt of the integration, but the numerical solver assumes that the function should be smooth, with unsmooth functions, there would be numerical errors.

Hash table O(1) amortized or O(1) average amortized?

This question may seem a bit pedantic but i've been really trying to dive deeper into Amortized analysis and am a bit confused as to why insert for a hash table is O(1) amortized.(Note: Im not talking about table doubling, I understand that)
Using this definition, "Amortized analysis gives the average performance (over time) of each operation in the worst case." It seems like the worst case for N inserts into a hashtable would result in a collision for every operation. I believe universal hashing guarantees collision at a rate of 1/m when the load balance is kept low, but isn't it still theoretically possible to get a collision for every insert?
It seems like technically the average amortized analysis for hashtable's insert is O(1).
Edit: You can assume the hashtable uses basic chaining where the element is placed at the end of the corresponding linked list. The real meat of my question refers to amortized analysis on probabilistic algorithms.
Edit 2:
I found this post on quicksort,
"Also there’s a subtle but important difference between amortized running time and expected running time. Quicksort with random pivots takes O(n log n) expected running time, but its worst-case running time is in Θ(n^2). This means that there is a small possibility that quicksort will cost (n^2) dollars, but the probability that this will happen approaches zero as n grows large." I think this probably answers my question.
You could theoretically get a collision every insert but that would mean that you had a poor performing hashing function that failed to space out values across the "buckets" for keys. A theoretically perfect hash function would always put a new value into a new bucket so that each key would refer to it's own bucket. (I am assuming a chained hash table and referring to the chain field as a "bucket", just how I was taught). A theoretically worst case function would stick all keys into the same bucket leading to a chain in that bucket of length N.
The idea behind the amortization is that given a reasonably good hashing function you should end up with a linear time for insert because the amount of times that insertion is > O(1) would be greatly dwarfed by the number of times that insertion is simple and O(1). That is not to say that insertion is without any calculation (the hash function still has to be calculated and in some special cases hash functions can be more calc heavy than just looking through a list).
At the end of the day this brings us to an important concept in big-O which is the idea that when calculating time complexity you need to look at the most frequently executed action. In this case that is the insertion of a value that does not collide with another hash.

Is QuickSort really the fastet sorting technique

Hello all this is my very first question here. I am new to datastructure and algorithms my teacher asked me to compare time complexity of different algorithms including: merge sort, heap sort, insertion sort, and quick sort. I search over internet and find out that quick sort is the fastest of all but my version of quick sort is the slowest of all (it sort 100 random integers in almost 1 second while my other sorting algorithms took almost 0 second). I tweak my quick sort logic many times (taking first value as pivot than tried to take middle value as pivot but in vain) I finally search the code over internet and there was not much difference in my code and code on internet. Now I really am confused that if this is behaviour of quick sort is natural (I mean whatever your logic is you are gonna get same results.) or there are some specific situations where you should use quick sort. In the end I know my question is not clear (I don't know how to ask besides my english is also not very good.) I hope someone can help me I really wanted to attach picture of awkward result I am having but I can't (reputation < 10).
Theoretically, quicksort is supposed to be the fastest algorithm for sorting, with a runtime of O(nlogn). It's worst case would be O(n^2), but only occurs if there are repeated values are equal to the pivot.
In your situation, I can only assume that your pivot value is not ideal in your data array, but is still able to sort the values using that pivot. Otherwise, your quicksort implementation is unfortunately incorrect.
Quicksort has O(n^2) worst-case runtime and O(nlogn) average case runtime. A good reason why Quicksort is so fast in practice compared to most other O(nlogn) algorithms such as Heapsort, is because it is relatively cache-efficient. Its running time is actually O(n/Blog(n/B)), where B is the block size. Heapsort, on the other hand, doesn't have any such speedup: it's not at all accessing memory cache-efficiently.
The value you choose as pivot may not be appropriate hence your sorting may be taking some time.You can avoid quicksort’s worst-case run time of O(n^2) almost entirely by using an appropriate choice of the pivot – such as picking it at random.
Also , the best and worst case often are extremes rarely occurring in practice.But any average case analysis assume some distribution of inputs. For sorting, the typical choice is the random permutation model (as assumed on Wikipedia).

Signal processing or algorithmic programming for a PLC

I have an application that takes voltages and temperatures as analog inputs and does some processing using an algorithm which involves signal processing such as low-pass filtering,
exponential smoothing, and other steps which might typically be done in a high-level programming language such as C or C++.
I'm curious how I could perform these same steps using a PLC, and in particular, the Allen-Bradley Control-Logix system? It seems to me that the instruction set with ladder logic is too limited for this. Could I perform this using structured text?
Ladder logic can do the computation just fine, although it isn't the nicest programming language in the world. It has a full complement of conditionals, arithmetic, arrays, etc.
Your real problem is fitting your computation into the cyclic execution model that most ladder logic engines (and Control Logix) run: a repeated execution of the program in the control from top to bottom, with each rung or computation being executed just once per scan.
If you need to loop over a set of values repeatedly before producing a result, you will likely have difficulty resolving the ladder engines' desire to execute everything "just once" per scan, and your need to execute a loop to produce a result. I believe in fact that there are FOR loop operators that can repeat a block of ladder code just as conventional loop; you need to ensure that the amount of time spent in your loops/algorithm don't materially affect the scan rate.
What may work well is for you to let the the scan rate act as one of your loops; typically you compute a filter by accepting a new value into an array and then computing a result over that array. Since you basically can't accept values faster than one-per-scan-cycle anyway, you can compute at-most-one-filter-result per scan cycle without losing any precision. If your array is of modest size (e.g., 10 values), you can in effect simply code a polynomial over the array as an equation to produce your filter result, and then code that polynomial (klunkily but straightforwardly) as ladder logic.
Control Logix PLCs do not have to execute on a cyclic sweep. I don't have RSLogix 5000 in front of me right now, but when defining the project, you are required to create one Program that executes on a cyclic sweep. But you can create other programs that do not. You can also run them off a trigger (not useful for regular input scanning) or off a fixed timer (very useful for input scanning). Keep in mind that there is no point in setting the input scan timer faster than your instrumentation updates-modern PLCs can frequently execute a scan much faster than a meter can update the data.
One good technique I have used for this is to create a program called one-second or something similar. This program will scan all your inputs, and perform all your signal processing, and then write to buffered memory locations. The rest of your program looks at those buffered memory locations, and never monitors the inputs directly. You can set the input-buffering program to execute as fast as needed for your process, up to whatever the PLC can handle before it faults.
It would also be a good idea to write your signal processing functions them selves as Add On Instructions, and then call them, with whatever parameters you need.
So you could have an AOI with a call interface like this:
input-1_buffered := input_smooth (low_pass, input-1);
This would call your input_smooth function, using input-1 as the value and input-1_buffered as the final location. low_pass would be used within the input_smooth function to jump to the appropriate logic.
Then you can write your actual smoothing logic in structured text, without anyone needing to understand it, because it will only exist in that one AOI.

Fastest language for FOR loops

I'm trying to figure out the best programming language for an analytical model I'm building. Primary consideration is speed at which it will run FOR loops.
Some detail:
The model needs to perform numerous (~30 per entry, over 12 cycles) operations on a set of elements from an array -- there are ~300k rows, and ~150 columns in the array. Most of these operations are logical in nature, e.g., if place(i) = 1, then j(i) = 2.
I've built an earlier version of this model using Octave -- to run it takes ~55 hours on an Amazon EC2 m2.xlarge instance (and it uses ~10 GB of memory, but I'm perfectly happy to throw more memory at it). Octave/Matlab won't do elementwise logical operations, so a large number of for loops are needed -- I'm relatively certain that I've vectorized as much as possible -- the loops that remain are necessary. I've gotten octave-multicore to work with this code, which makes some improvement (~30% speed reduction when I get it running on 8 EC2 cores), but ends up being unstable with file locking, etc.
+I'm really looking for a step change in run-time -- I know that actually using Matlab might get me as much as a 50% improvement from looking at some benchmarks, but that is cost-prohibitive. The original plan when starting this was to actually run a Monte Carlo with this, but at 55 hours a run, that's completely impractical.
The next version of this is going to be a complete rebuild from the ground up (for IP reasons I won't get in to if nothing else), so I'm completely open to any programming language. I'm most familiar with Octave/Matlab, but have dabbled in R, C, C++, Java. I'm also proficient w/ SQL if the solution involves storing the data in a database. I'll learn any language for this -- these aren't complicated functionality we're looking for, no interfacing with other programs, etc., so not too concerned about learning curve.
So with all that said, what's the fastest programming language specifically for FOR loops? From a search of SO and Google, Fortran and C bubble to the top, but looking for some more advice before diving in to one or the other.
Thanks!
This for loop looks no more complex than this when it hits the CPU:
for(int i = 0; i != 1024; i++) translates to
mov r0, 0 ;;start the counter
top:
;;some processing
add r0, r0, 1 ;;increment the counter by 1
jne top: r0, 1024 ;;jump to the loop top if we havn't hit the top of the for loop (1024 elements)
;;continue on
As you can tell, this is sufficiently simple you can't really optimize it very well[1]... Refocus towards the algorithm level.
The first cut at the problem is to look at cache locality. Look up the classic example of matrix multiplication and swapping the i and j indexes.
edit: As a second cut, I would suggest evaluating the algorithm for data-dependencies between iterations and data dependency between localities in your 'matrix' of data. It may be a good candidate for parallelization.
[1] There are some micro-optimizations possible, but those will not produce the speedsups you're looking for.
~300k * ~150 * ~30 * ~12 = ~16G iterations, right?
This number of primitive operations should complete in a matter of minutes (if not seconds) in any compiled language on any decent CPU.
Fortran, C/C++ should do it almost equally well. Even managed languages, such as Java and C#, would only fall behind by a small margin (if at all).
If you have a problem of ~16G iterations running 55 hours, this means that they are very far from being primitive (80k per second? this is ridiculous), so maybe we should know more. (as was already suggested, is disk access limiting performance? is it network access?)
As #Rotsor said, 16G operations / 55 hours is about 80,000 operations per second, or one operation every 12.5 microseconds. That's a lot of time per operation.
That means your loops are not the cause of poor performance, it's what's in the innermost loop that's taking the time. And Octave is an interpreted language. That alone means an order of magnitude slowdown.
If you want speed, you first need to be in a compiled language. Then you need to do performance tuning (aka profiling) or, just single step it in a debugger at the instruction level. That will tell you what it is actually doing in its heart of hearts. Once you've got it to where it's not wasting cycles, fancier hardware, cores, CUDA, etc. will give you a parallelism speedup. But it's silly to do that if your code is taking unnecessarily many cycles. (Here's an example of performance tuning - a 43x speedup just by trimming the fat.)
I can't believe the number of responders talking about matlab, APL, and other vectorized languages. Those are interpreters. They give you concise source code, which is not at all the same thing as fast execution. When it comes down to the bare metal, they are stuck with the same hardware as every other language.
Added: to show you what I mean, I just ran this C++ code, which does 16G operations, on this moldy old laptop, and it took 94 seconds, or about 6ns per iteration. (I can't believe you baby-sat that thing for 2 whole days.)
void doit(){
double sum = 0;
for (int i = 0; i < 1000; i++){
for (int j = 0; j < 16000000; j++){
sum += j * 3.1415926;
}
}
}
In terms of absolute speed, probably Fortran followed by C, followed by C++. In practical application, well written code in any of the three, compiled with a descent compiler should be plenty fast.
Edit- generally you are going to see much better performance with any kind of looped or forking (e.g.- if statements) code with a compiled language, versus an interpreted language.
To give an example, on a recent project I was working on, the data sizes and operations were about 3/4 the size of what you're talking about here, but like your code, had very little room for vectorization, and required significant looping. After converting the code from matlab to C++, runtimes went from 16-18 hours, down to around 25 minutes.
For what you're discussing, Fortran is probably your first choice. The closest second place is probably C++. Some C++ libraries use "expression templates" to gain some speed over C for this kind of task. It's not entirely certain those will do you any good, but C++ can be at least as fast as C, and possibly somewhat faster.
At least in theory, there's no reason Ada couldn't be competitive as well, but it's been so long since I used it for anything like this that I hesitate to recommend it -- not because it isn't good, but because I just haven't kept track of current Ada compilers well enough to comment on them intelligently.
Any compiled language should perform the loop itself on roughly equal terms.
If you can formulate your problem in its terms, you might want to look at CUDA or OpenCL and run your matrix code on the GPU - though this is less good for code with lots of conditionals.
If you want to stay on conventional CPUs, you may be able to formulate your problem in terms of SSE scatter/gather and bitmask operations.
Probably the assembly language for whatever your platform is. But compilers (especially special-purpose ones that specifically target a single platform (e.g., Analog Devices or TI DSPs)) are often as good as or better than humans. Also, compilers often know about tricks that you don't. For example, the aforementioned DSPs support zero-overhead loops and the compiler will know how to optimize code to use those loops.
Matlab will do element-wise logical operations and they are generally quite fast.
Here is a quick example on my computer (AMD Athalon 2.3GHz w/3GB) :
d=rand(300000,150);
d=floor(d*10);
>> numel(d(d==1))
ans =
4501524
>> tic;d(d==1)=10;toc;
Elapsed time is 0.754711 seconds.
>> numel(d(d==1))
ans =
0
>> numel(d(d==10))
ans =
4501524
In general I've found matlab's operators are very speedy, you just have to find ways to express your algorithms directly in terms of matrix operators.
C++ is not fast when doing matrixy things with for loops. C is, in fact, specifically bad at it. See good math bad math.
I hear that C99 has __restrict pointers that help, but don't know much about it.
Fortran is still the goto language for numerical computing.
How is the data stored? Your execution time is probably more effected by I/O (especially disk or worse, network) than by your language.
Assuming operations on rows are orthogonal, I would go with C# and use PLINQ to exploit all the parallelism I could.
Might you not be best with a hand-coded assembler insert? Assuming, of course, that you don't need portability.
That and an optimized algorithm should help (and perhaps restructuring the data?).
You might also want to try multiple algorithms and profile them.
APL.
Even though it's interpreted, its primitive operators all operate on arrays natively, therefore you rarely need any explicit loops. You write the same code, whether the data is scalar or array, and the interpreter takes care of any looping needed internally, and thus with the minimum overhead - the loops themselves are in a compiled language, and will have been heavily optimised for the specific architecture of the CPU it's running on.
Here's an example of the simplicity of array handling in APL:
A <- 2 3 4 5 6 8 10
((2|A)/A) <- 0
A
2 0 4 0 6 8 10
The first line sets A to a vector of numbers.
The second line replaces all the odd numbers in the vector with zeroes.
The third line queries the new values of A, and the fourth line is the resulting output.
Note that no explicit looping was required, as scalar operators such as '|' (remainder) automatically extend to arrays as required. APL also has built-in primitives for searching and sorting, which will probably be faster than writing your own loops for these operations.
Wikipedia has a good article on APL, which also provides links to suppliers such as IBM and Dyalog.
Any modern compiled or JITted language is going to render down to pretty much the same machine language code, giving a loop overhead of 10 nano seconds or less, per iteration, on modern processors.
Quoting #Rotsor:
If you have a problem of ~16G iterations running 55 hours, this means that they are very far from being primitive (80k per second? this is ridiculous), so maybe we should know more.
80k operations per second is around 12.5 microseconds each - a factor of 1000 greater than the loop overhead you'd expect.
Assuming your 55 hour runtime is single threaded, and if your per item operations are as simple as suggested, you should be able to (conservatively) achieve a speedup of 100x and cut it down to under an hour very easily.
If you want to run faster still, you'll want to look at writing multi-threaded solution, in which case a language that provides good support would be essential. I'd lean towards PLINQ and C# 4.0, but that's because I already know C# - YMMV.
what about a lazy loading language like clojure. it is a lisp so like most lisp dialects lacks a for loop but has many other forms that operate more idiomatically for list processing. It might help your scaling issues as well because the operations are thread safe and because the language is functional it has fewer side effects. If you wanted to find all the items in the list that were 'i' values to operate on them you might do something like this.
(def mylist ["i" "j" "i" "i" "j" "i"])
(map #(= "i" %) mylist)
result
(true false true true false true)