Please help me to understand how to search a job or stream for multiple days using workload scheduler, i tried to use "Time Data Filter" but it is not working as expected.
The "List plan" allows to select any one archived dates. i tired symnew, but no joy. It allows only to search for a particular date.
I would like to search a job for X days and get the Start/End time as an output.
For example: I need to search a job "XXXX" from 1st march till 30th March.

You can search day by day using archived plans.
To look to jobs at any date, you can use a "Job Run History Report", this will include only a subset of the information, but allows to find jobs on larger date intervals.
History is kept in the database and you can alternatively run queries using SQL.
The history is automatically cleanup up after some days specified by logHistory / lh optman option, that by default is set to 400 days.

Related

Is there a way to get estimated time of completion of a currently running Informatica workflow in Infra metadata tables

I am working with this metadata table REP_WFLOW_RUN currently from Infra DB, to get status about workflows. The column run_status_code shows whether this wf is running, succeeded, stopped, aborted etc..
But for my Business use case I also need to report to Business, the estimated time of completion of this particular work flow.
Example: If suppose the workflow generally started at 6:15, then along with this info that work flow has started I want to convey it is also estimated to complete at so and so time.
Could you please guide me if you have any details on how to get this info from Informatica database.
Many thanks in advance.
This is a very good question but no one can answer correctly :)
Now, you can get some logic like other scheduling tool does.
First calculate average time the workflow takes to complete for a successful run. And output should be a decimal value.
select avg(end_time - start_time )*24 avg_time_in_hr, workflow_name
From REP_WFLOW_RUN
Where run_status_code='succeeded'
Group by workflow_name
You can use above value as estimated time to completion for that workflow. Output should be a datetime.
Select sysdate + avg_time_in_hr/24 est_time_to_complete from dual
Now, this value is an estimated figure and not correct value. So on a bad day, if this takes hours, average value will be bad but we cant do much here.
I assumed, your infa metadata is on oracle.

UiPath Orchestrator Triggers - Cron Expression For specific day of month or next working day if not a working day

I've currently got this Cron expression that I'm using to trigger a process in UiPath Orchestrator:
0 0 15 21W * ? *
Runs on the closest working day to the 21st of each month at 3pm.
However I need it to run on the next working day at 3pm if the 21st is a non working day.
Tried searching for an answer and nothing quite fit the brief.
I used this website to build my expression (which is a great tool) but it only had an option for 'nearest day' and not next working day given a specific day of month: https://www.freeformatter.com/cron-expression-generator-quartz.html
As you don't need the nearest day, you can't use the functionality of Orchestrator cronjob. I would recommend creating a wrapper process as follows:
Create a new process, let's call it StartJobByCheckingDate
Now create a trigger that starts StartJobByCheckingDate each day at 3pm
So that process is now your manager of your desired process
Now we need to check if it is the 21th day
Here you have different ways to solve it
You could create a DataTable or even a file in the StartJobByCheckingDate process, that contains all the different days where your desired process should be fired (but this is very manual, you might not want to update this every year, so this might not be the smartest but the easiest solution)
The other idea is to check if the current day is the 21th day. If so check if it is Saturday/Sunday (non-working day).
If true: you could now create a empty dummy file somewhere that tracks that the 21th was a non-working day, and the next day you check that file existing, if it exists you check the current day to be a working day, and if so you delete the file again and start your desired process
If false: just start your desired process directly
I think 2. idea would be that best. Sure you have 365 jobs runs/year. But when you keep that helper process smart this will just be seconds.
Another idea instead of using the dummy file, would be to use Entities. Smarter but need some more time to get familiar with.
We have (had) the exact same issue. Since UiPath doesn't offer a feasible solution out of the box, we will work around the restriction using the following strategy: We trigger the actual job daily, considering a custom-built, static NonWorkingDay-list that will just suppress the execution of the robot every day we don't want it to run.
These steps are needed:
Get a list with of all known bank holidays, saturdays and sundays until 2053 or so...
Build a the static exclusion-list using a script that does something like this (pseudocode. I will update the answer once we have actually implemented the solution):
1. get all valid execution dates
loop through every 28th of the month until end of 2053
if the date is in the bankHolidayList then
loop until the next bankDay is found
add it to the list of valid ExecutionDates
else
add the date to the validExecutionDate-list
2. build exclusion-list
loop through every day until end of 2053
if the date is not in the validExecutionDate-list
add it to the exclusionDate-list
Format the csv accordingly and upload it to the orchestrator tenant as a NonWorkingDay-List
Update your trigger to run daily at your desired time, using the uploaded NonWorkDay-Calendar
While the accepted answer will surely work as well, we prefered to go with this approach because having a separate robot that does nothing but executing a UiPath trigger just doesn't seem right to me. With this approach we have no additional code that we potentially need to maintain.
In my oppinion not having a solution for this concern out of the box is a lack of feature that UiPath will (hopefully) fix until end of 2053 ;-)
Cheers
You can configure your trigger to launch oftener, then manage dates at init of your process, but you must set up a list of "holydays" or check in some way.
Also you can use the calendar option of orchestrator (+info)

In Azure devops, how to query task that was not close in the same day it was activated/ when the state was changed?

Im a bit new at azure devops and I am trying to view task that was not close in the same day it was activated/ when its state was changed using query. My point of confusion is that I dont know how compare the state change date with the close date.
the output should be tasks that are still active and task that are closed but not in the same date it state was change
UPDATE
So I was wondering if my approach was wrong so I tried different approach.
here I try using the []<> to compare completed date with activation date, it should have sorted to show only task that the activation date are different from the close date but here I still got shown tasks which have close date and activation date in the same date.
UPDATE 2
Since I cant use the '[]<>', I decided to use the not so smart way to compare the task close date, active date, and create date as seen in the screenshot below, it is ugly but it works. If anyone knows a smarter way to do this, please do tell.
My current solution
I still got shown tasks which have close date and activation date in the same date.
The reason for this problem you met is that when you use the condition “Closed Date <>[Field] Activated Date”, the values of these two fields are actually datetime format which means it contains hours, minutes and seconds like below:
That’s why you can still see the records shown with same date.
As for the requirement you mentioned, there’s no directly available solution you can use in Azure DevOps Query as far as I know.
In addition, please refer to Group clauses where you can see how to set conditions for “not close in the same day it was activated/ when its state was changed”, like below:

Identifying the last time customers ordered a particular item and have them enter a workflow

I have made a Customer search that identifying the customers that haven't purchased an item in six months or more. I've used group summaries and maximum summaries for the company name and the maximum transaction date, which refers to the latest sales order containing a certain item. The idea is to send them an email. However, the workflow is only executing on 20 records at a time. i even conducted a search that was not summarized and the workflow still only executed on 20 records. I did use the "Execute Now" button in testing mode to see how many entered the work flow from the summary search. But each execution only yields 20 workflow instances. the searches yield about 213 and 300 records respectively. I appreciate any insight!
Workflows using searches will only process 20 records when in testing mode.
From SuiteAnswers Article 36738 (NetSuite Login required)
When you execute a workflow on demand, NetSuite only processes the first 20 records returned by the saved search. For example, if the saved search for a scheduled workflow returns 1000 records, the workflow only initiates on the first 20 records returned by the saved search.

Do multiple scripts (projects) contribute to Trigger Aggregate Execution Time?

I have ScriptA with some functions in files that have triggers that all run under UserA and consume about 2 hours of runtime per day.
I have another project ScriptB with some other functions in other files that have triggers that all run under UserA (the same user as ScriptB users) and consume about 3 hours of runtime per day.
Is my Trigger Aggregate Execution Time quota (from quota page here) aggregated per user or per script? That is, is it:
Five hours (2 + 3) for UserA or is it
Two hours for ScriptA and 3hrs for ScriptB?
I have seen this answer but it doesn't explicitly address the scoping question I'm asking.
Obviously is per user not ler script. Otherwise quotas wouldnt make sense.
In the interests of getting some evidence together for this:
At 4m25 in this March 2013 episode of Google Apps Unscripted, Kalyan Reddy says that the quotas are "per account type" and as you can see in the dashboard, the Quota table is gridded and has columns labelled with those account types too.
I have also done some testing and made a script that uses quite a bit of time. It started to max out other scripts running under the same account and many of that account's triggered scripts started to get errors "Service using too much computer time for one day". But... interestingly, after a couple of days of those errors have subsided. I believe on a consumer account I am now getting way more execution time than 1 hr per day.
While not a direct answer to the question and still a leap of logic/assumption, these two things make me feel that "per account" is more likely to be correct than "per script". I'll keep the question open for a bit longer for any comments (esp Googlers).