Events sheet is not auto-updated to the newest date - date

Why my events sheet in Big Query are not updated to Jan 13,2020? It's still Dec 30,2019. I can't see the newest event sheet. Aren't they auto updated to the newest date with time passing?

Related

Flutter CrCalendar: Events scheduled on border dates (last column) appear as full week event on the next week

I am using the flutter pub.dev package cr_calendar Here is a screenshot of the problem:
This event is scheduled on the 28th of august, and I am passing the parameter begin & end as the same DateTime.
If I change the first day of the week, and move the event date to the new border date, the same thing happens.
If I add minutes, or event make the end date 23:59 minutes later, same behavior.
If I make both dates UTC, same behavior.
How can I fix this?
I want to note that I am using a repo fork (because I needed some custom fields) so maybe this was fixed already. The fork was created on July 10th 2022.
Here is a link to the issue on their GitHub Repo: enter link description here

Google Sheets: Automatically Increment Date by 1 Month

I am currently using a budget sheet that automatically updates date cells to the next "payment" date for a bill. As an example:
=VALUE("2019-03-08")+14*FLOOR((NOW()-VALUE("2019-03-08"))/14)
The cell starts with a date and it then updates every 14 days to the new date. This shows me a cell that has the date of the biweekly payment that is due. In the above example, the cell shows the value of "2019-03-08" until 2 weeks have passed. Once 14 days have passed, the cell will automatically upload to "2019-03-22". This automation will continue forever in 14-day increments. The date displayed in the cell will always update automatically to the next 14-day date. This helps me display the exact due date of a biweekly payment without updating the cell.
I want to do the same thing for a monthly payment, but using a day count of 30 is not very accurate. Is there a way to modify this method to let me update the date automatically to the 24th of the month, every month, on that day. So I start with 2/24/2019 and when 3/24/2019 hits, the cell updates to that date, and so on. The reason this is not accurate is that the months are not all 30 day periods. February is 28 days and some are 31 days. I want the cell to increment in 1 month periods in the same way that the above formula updates in 14-day increments. As an example: The date will display "2/24/2019" until the same day on the next month occurs, then the cell will update to "3/24/2019". This process will continue forever with 4/24/2019, 5/24/2019, etc. It will continue with the year as well, so 12/24/2019 will change automatically to 01/24/2020.
UPDATE: Updated the description with examples of how the behavior works and what I am looking for...
It's much simpler than this. Use the EDATE function (e.g.):
=EDATE(A1,1)
Where A1 is your starting date and 1 is the number of months you which to increment by. See https://support.google.com/docs/answer/3092974?hl=en for more details.
this formula will increase the month every 24th and accounts for year change as well
=IF(DAY(TODAY())>=24,
DATE(YEAR(TODAY()), MONTH(TODAY())+1, 24),
DATE(YEAR(TODAY()), MONTH(TODAY()), 24))
paste where you need and drag down:
=VALUE("2019-"&ROW(A3)&"-08")+14*FLOOR((NOW()-VALUE("2019-"&ROW(A3)&"-08"))/14)

Identify and name a timestamp for specific data entry points

I have a situation where I'm trying to look at changes in data based on timestamp of user entry (or 'created on').
The data highlights planning for delivery of goods, users have the ability to 're-plan' their dates of entry.
What I need to do is look at the timestamp for each 're-planning' date and be able to tell if the date of planning was changed within 7 days of delivery. For example
Data line XXY was planned for delivery on the 29th of August, 2017...but was changed, ON the 27th, to the 30th....this is a flag...
Like wise XXZ was planned for the 30th but changed to September 15th on the 29th...also a flag. Both were changed within 7 days of their previous 'delivery' date. Does this make sense and is there a simple way to do this?

Tableau not displaying all dates till current date

I have a tableau worksheet that shows a count of records by date. Current system date is Mar 14 but my dataset has data only till Mar 9. Is it possible to show dates from Mar 10 - Mar 14 even though there is no data for this time frame.
Given is a snapshot of my worksheet, kindly let me know how could I include all dates in the row even though there is no data for this time period.
Select discrete row it will show the date on a sheet

How do I set the date to always read last Saturday in Tableau?

I do weekly reporting in Tableau and each page is labelled to say data is pulled through every Saturday (Image below).
My question is if there is a way to program that date to update every week on its own, without having to manually do it for every page on a 52 page report?
I'm not looking to update any data fields, just that label for each page.
See the below link on how you can pull in the last data refresh date:
http://kb.tableau.com/articles/howto/adding-data-refresh-time-stamp-to-view
Or you could have one calculated field that hold this date and add it to every page/view. Then you just have to update one field which will update every view.