I am looking for a way in Azure DevOps to have a good overview of the status of my A/B tests - azure-devops

Since the process of one A/B test usually takes multiple sprints I would like to add another board in which I can add the A/B tests (as F.E. features). User stories for one sprint can then be added to a specific sprint for my team (which consists of a few specialists and a developer). This way I am able to overview the status (research phase, test , code writing, running, analysis, etc.) of all tests in one overview. I have not been able to find out how this is possiblie within Azure Devops, or if there is a work around. Can anyone help me?
My team also works in projects other than A/B tests, which means we cannot use the boards section.
Unless there is a hidden way to add another board to a team?

You could Copy or clone a work item to add the user stories or tests to a new boards. Open the user story you want to clone, then click Create copy of work item and choose whether to include exist links, attachments and child work items. After creating, change the Area and Iteration to your target boards.
Update
In Azure DevOps you can only create boards by creating a team. The team board is created as a side-effect of creating the team. Please refer to Manage and configure team tools and Configure and customize Azure Boardsfor details.
After creating and configuring a new team, you could see the boards in the dropdown list.

Related

AzureDevops process custom rules can't change Team project

I have problem with configuration of AzureDevOps process.
My goal is simply automate work items - when work item changes state to done or is in state done on certain board I want to transfer it on other board.
I tried to achieve this by applying custom rules in my organization. Example:
I navigate to Organization Settings, select Process then I select process from list (is inherited from Scrum parent). Then I select bug (for example) and go to rules tab.
Here is screen of my configuration
Both Board no.1 and Board no.2 exist as Team Projects. I've added clearing assign to field and this one works properly.
I wondering if there is much easier way to automate moving work items through boards or team projects on status change.
I wondering if there is much easier way to automate moving work items
through boards or team projects on status change.
For this issue, I am afraid there is no easier way to achieve this requirement. Azure Devops has provided a built-in custom rule function to achieve this. This is already a very easy way.
In addition, we can also achieve this through the azure logic app, but this needs to be set in the azure portal. I don’t think it will be more convenient than custom rules.
To move work items to another project, you must be a member of the Project Administrators group or be granted explicit permissions to move work items.

Query regarding Backlog Levels in Azure Devops

I'm trying to configure and customize the Azure DevOps tool as per the requirement for my application development team. In the boards setting, I have selected the option "Bugs are managed with Tasks" to get a good view of my sprint items. However, my team reports post production issues as Bugs in the tool and enabling the above mentioned setting doesn't allow me to view these Bugs in the Kanban Boad. Reason is they are not linked with any User Story.
I have been exploring the options in Backlog levels options available in the Processes settings and found that the Backlog level "Stories" is tagged only for User Story.
My query here is can i try linking Bug and Task to the already existing "Stories" backlog level. Azure DevOps does gives option to create a custom backlog level and custom Work item type. I would like to customize the existing functionality to best fit my team. Please let me know if there is a work around.
Query regarding Backlog Levels in Azure Devops
This behavior is by designed and there is no way to fix it at present for the exists Work item type Bug.
Because there is only one requirement backlog and it cannot be removed, but can be renamed and edited:
There is an user voice about this request on the Developer Community.
As workaround, we could create a custom the Work item type and add it to backlog level, for example, I create a custom Work item type BugWithoutTask, then add it portfolio backlog:
Then go to backlog settings and enable new backlog:
Now, we could these BugwithoutTask in the Kanban Boad:
You could check this document for some more deails.
Hope this helps.

Azure Devops WorkItems

I am new to azure devops and devops field. I am exploring myself in azure devops, where learning boards. I I was confused while updating the status of my work item. I was assigned with a task (example: create a login page. Now i went to azure boards and its allowing me to edit the title and priority fields. Those are already set by my higher levels. I only need to add details like time efforts, status). What security is our team missing to achieve this?
Also i need to move the work items from one stage to next stage(Todo to completed) via VS2017. How to achieve that. Now i am currently going to devops portal and drag and drop the workitems to next columns.
If you have permission to edit a work item, you can edit any field on the work item. This is by design. Whether it's a limitation or not is up to you to decide.
You can update the work item state from Visual Studio by linking it to your commit in the team explorer. Refer to the documentation.

VSTS: Group level between feature and work item

I am working as a Product Owner for a development team using scrum, we are using VSTS for our backlog.
So far I have been organizing my backlog using Epics and Features, I am mainly using features.
I use Features both to group work items but also for keeping control of delivering stuff. If I for instance know that I need to deliver a certain functionality a certain day then I create a Feature for that and include the needed work items. I need to do that because I manage many projects simultaneously.
So far, so good.
But now Product Management want to start creating Epics and Features for them to organize work. I can live without the Epics, and it is fine that they create the features and I add work items. But when I start executing I need some way to organize into deliverables.
Any idea how I can do that, basically I need a group like features but in between feature and work item
You can add tags for your and other Epics to distinguish them...
basically I need a group like features but in between feature and work item
Alternatively you can create a new work item type like features. Please see Customize a project using an inherited process for details.
Create an inherited process
Custom the process
Add a new work item type
...
Apply the customized process to your project
UPDATE:
You need to add a new Portfolio backlog level, but in Azure DevOps (VSTS) the new Portfolio backlogs can only be added as the top level, that means the hierarchy should be Deliverable > Epic > Feature > Backlog Item.
So, in this case you can rename them to match your requirements, for example rename Feature to Deliverable, Epic to Feature, Deliverable to Epic...
Please see Customize your backlogs or boards for details.

VSTS: Sharing Stories/Feature & Epic between Teams

Is there a way to share Epic/Feature/Stores between Team.
We have the Following Teams
1) PM, BA, DEV, Testing for most of the projects.
For a given userStory that might be tasks that are done by BA and only visible to them. But when their work is completed for that user Stories DEV team will pick up and create their own Task for that same user Story that BA team worked upon.
Similarly, when the Dev Task is completed Testing team will create other Task under that story.
How do i organize such a setup in VSTS so that I don't have to duplicate user stories/epic and features between team ?
In VSTS, you probably want to define your own workflow stages, which will be the columns on the Kanban board view. Your stages sounds something like Analysis, Dev, Test, etc.
This way, as each team member wants to progress the task, they will update the work item to the next work stage and likely reassign the task to a new team member.
See these articles for more details (which provide an example workflow very similar to yours):
https://www.visualstudio.com/en-us/docs/work/kanban/add-columns
https://www.visualstudio.com/en-us/docs/work/kanban/kanban-basics
The simple way is that you can change work items’ area to the corresponding area of other team.
If you want to achieve other teams can see the related work items too, you can create a new area (e.g. SharedArea1) and assign to these teams. After that, you can change related work items’ area to that area (SharedArea1)
Team admin page (add another area):
This article may benefit you: Multiple teams