ADO YAML pipeline: deploy nightly OR when manual approval is given - azure-devops

We are currently switching over from Classic (UI) Azure Pipelines to YAML pipelines.
We would like to deploy a branch every night to an environment (when changes have occurred) and also be able to deploy to this environment manually. With the Classic pipelines it was easy to setup a scheduled deploy to an environment that could also be triggered manually when desired.
In the new YAML pipelines we currently use the "Business hours"
check to make sure the nightly deploy takes place, but we are unable to override the check when a manual deployment is needed.
Is there a way to setup a YAML pipeline where a deploy waits for either a manual approval or a scheduled trigger to occur?

Related

How to build a dashboard for YAML Pipelines with deployment job

We have been converting our Release pipelines in Azure DevOps to instead be YAML files that run as Pipelines. This is so we can store our deployment process as code. The deployment process is working well - so a developer commits code and the Pipeline builds and publishes the artifact in one stage and then it auto-deploys to the QA environment in another stage. Subsequent stages deploy to an Environment (e.g. QA, Staging, Production) each of which requires some approval(s). The deployments themselves aren't the issue.
What I'm struggling with is unlike the old Releases there isn't a dashboard that will tell me which version of the project is in each environment. The Pipeline summary represents each stage for the Run as a dot (running, succeeded, failed, canceled, etc.) but wasn't built to represent what each environment has (probably because a stage doesn't have to be a deployment).
Is there somewhere else I can look for this information or do I have to build my own dashboard by calling the AzDO APIs? Looking at the Environment gives a list and I can root through the history, but that's not the experience our developers are looking for.

How to "swap" staging and production slots in release pipeline?

Is there a setting in Azure Devops release pipeline to "swap" deployment slots, similar to how it can be done in Azure Portal with source/target?
We have a stage where after the developer has verified the deployment on staging environment, he would want to enable the swapping to production, but I cannot find a setting like that. The only deployment slot setting I came across in Azure Devops is specifying the slot in App Service deployment task, but theres no swapping mechanism that I see...
Yes, this can be achieved in an Azure DevOps release pipeline.
The only deployment slot setting I came across in Azure Devops is specifying the slot in App Service deployment task...
Yes, this is the first step - deploy your app to a slot using the above-mentioned task:
Then, add a new Azure App Service Manage task to the job:
Which you can then configure like:
You just need to ensure that the Source Slot points to the same one you've deployed to in the Azure App Service deploy task.

Execute a stage in DevOps Release pipeline every night on scheduler

I have an Azure DevOps CI Build and Release pipeline in following setup:
CI Build runs with each new commit in develop branch and creates a Build Drop (Artifact)
Release pipeline runs with each new Artifact and deploys to INT and eventually to PROD (after manual approval)
I would like to add a 3rd stage (called eg. MONITOR) which would run after the PROD release every night using the same drop as the PROD stage used, with following schema:
[Build Drop] -> [INT] -> manual approval: [PROD] -> nightly scheduler: [MONITOR]
This seems to be impossible to me, do you know how to achieve this goal?
Following is crucial for me:
the MONITOR and PROD run always from exactly the same Artifact
MONITOR is executed only if the PROD was successful
if there is a newer PROD release, the old MONITOR is not executed any more and instead the newest one is executed using the newest Artifact which made it to PROD
I tried so far following:
merge develop to master when the commit made it to PROD. And then used scheduled nightly Build from master with MONITOR stage - it works, but MONITOR uses different Artifact than PROD, so not usable for me
used scheduled trigger for MONITOR after PROD - does not work, the MONITOR is executed only once at scheduled time and never again
created extra release pipeline based on specific Artifact version with a scheduled trigger - this works, but I have to maintain the specific Artifact version manually with each successful PROD release. Another caveat is that I have to use 2 separate pipelines which makes the overview not so nice. (but, so far the best solution I achieved)
do you have better ideas? many thanks
What I would do is have 2 separate Release Pipelines.
This allows you to schedule the release without producing a new artifact (scheduled build).
Then, I would do some of what #Soccerjoshj07 suggested in that I would invoke the REST api in a task on the MONITOR pipeline/stage.
I would make the REST api call to the Releases endpoint to get the top=1 releases for releasedefinitionid=x. Then use the Release Environment endpoint to get the PROD environment for that latest release id. With the environment in hand, check the status for succeeded. If not, fail the release.
Edit as per new requirement outlined in comment
Given PROD.1 is succeeded and PROD.2 is failed when MONITOR is triggered, then the artifact from PROD.1 should be used for MONITOR.
With this criteria I would change some things. Rather than have the MONITOR go digging for the latest PROD release and fail if the latest is failed, I would make the successful PROD stage tag its build artifact and employ artifact filters on the Monitor pipeline.
The tagging can occur via the REST api or using the Tag Build or Release Task from Colin's ALM Corner Build & Release Tools and might look like this:
Are you using a YAML template, and if so have you played with the cron schedules? https://learn.microsoft.com/en-us/azure/devops/pipelines/build/triggers?view=azure-devops&tabs=yaml#scheduled-triggers
If using classic Release UI, I think you can have the definition trigger be on a schedule but that would queue the entire definition. You might have to get creative with variables and maybe create 'isScheduled=true' and use that to determine if it should skip tasks.
Other ideas:
Create a logic app or function app that calls the REST API? Sample app and github link here: https://oshamrai.wordpress.com/2019/04/22/azure-devops-rest-api-19-queue-builds-and-download-build-results/
The Azure-Devops AZ CLI extension might be easier, though: https://learn.microsoft.com/en-us/cli/azure/ext/azure-devops/pipelines/build?view=azure-cli-latest#ext-azure-devops-az-pipelines-build-queue
Beside setting up two release pipelines, if you want to use scheduled trigger for only one Stage, I am afraid there is no such out of box way to achieve that, scheduled trigger is only for entire pipeline.
As a workaround, you can add a custom condition for the job of MONITOR stage.
For example in yaml:
- stage: MONITOR
jobs:
- job:
condition: and(always(), eq(variables['Release.Reason'], 'Schedule'))
steps:
In UI , you can set this in Run this job of agent job:
In this case, the stage only executed when the release triggered by scheduled trigger. If the release is triggered by other reasons, the MONITOR stage will be skipped .
The limitation of this workaround is that when your pipeline is triggered by a scheduled trigger, two other stages are also executed.
Or write a script with powershell task (in INT/PROD stages) to determine whether Release.Reason is Schedule. If yes , skip the current stage.
For how to obtain the latest artifact version of PROD and determine the deployment status of PROD, you can refer to the two answers above.

Azure DevOps Release Pipelines: Letting release flow through multiple environments with manual triggers

I'm trying to configure Azure DevOps Release pipelines for our projects, and I have a pretty clear picture of what I want to achieve, but I'm only getting almost all the way there.
Here's what I'd like:
The build pipeline for each respective project outputs, as artifacts, all the things needed to deploy that version into any environment.
The release pipeline automatically deploys to the first environment ("dev" in our case) on each successful build, including PR builds.
For each successive environment, the release must have been deployed successfully to all previous environments. In other words, in order to deploy to the second environment ("st") it must have been deployed to the first one ("dev"), and in order to deploy to the third ("at") it must have been successfully deployed to all previous (both "dev" and "st"), etc.
All environments can have specific requirements on from what branches deployable artifacts must have been built; e.g. only artifacts built from master can be deployed to "at" and "prod".
Each successive deploy to any environment after the first one is triggered manually, by someone on a list of approvers. The list of approvers differs between environments.
The only way I've found to sort-of get all of the above working at the same time, is to automatically trigger the next environment after a successful deployment, and add a pre-deployment gate with a manual approval step. This works, except the manual approval doesn't trigger the deployment per se, but rather let an already triggered deployment start executing. This means that any release that's not approved for lifting into the next environment, is left hanging until manually dismissed.
I can avoid that by having a manual trigger instead of automatic, but then I can't enforce the flow from one environment to the next (it's e.g. possible to deploy to "prod" without waiting for successful deployments to the previous stages).
Is there any way to configure Azure DevOps Release Pipelines to do all of the things I've outlined above at once?
I think you are correct, you can only achieve that by setting automatic releases after successful release with approval gates. I dont see any other options with currect Azure DevOps capabilities.
Manual with approval gates doesnt check previous environments were successfully deployed to, unfortunately.
I hope this provides some clarity after the fact. Have you looked at YAML Pipelines In this you can specify the conditions on each stage
The stages can then have approvals on them as well.

Go-CD: Automatic vs manual trigger of pipeline when using templates

We are using templates for deploy pipeline. We have 3 environments where we want to deploy. Problem we are facing is triggering of pipeline.
Ideal scenario would be to automatic deploy to dev environment where we run API level functional tests after deploy and manually deploy to UAT and production when we are satisfied with manual and automatic testing results.
Deploy pipelines are same and we create them from template with environment name as parameter. Is there a way to tell GO CD to conditionally start a pipeline build from template (something like if dev start automatic else start manual in meta language)?
If you can have environment name as environment variable instead of parameter, you can trigger your deploy pipeline using pipeline api. So you can keep your deploy pipeline in manual trigger mode and have another pipeline which can poll for changes and automatically trigger the pipeline api for your dev environment deployment. For UAT and production environment you can use the templatised pipeline with manual trigger. I don't think we can control the trigger based on a parameter or an environment variable.