I'm using ng zorro date range picker and when I select first day I want to add 7 days from that day and show it. So user can only select start date, but it needs to show that range [start date + 7 days] any suggestion or I have to do it custom with html.. the best thing would be, if ng zorro date range picker have option to get event when selecting first date.
Related
Date picker used in our application has 2 dropdowns in it (list of months and years) in UI. Manual input is disabled for some reason and hence it's getting difficult for us to handle it in jmeter.
Scenario is:
User will select Year first > then month > then date in FROM dropdown and TO dropdown will contain any date (select Year first>then month> then date) which is greater than date selected in FROM but wil be less or equal to today's date.
How can I achieve the same on jmeter? thanks in advance.
Usually, the date value is being send to the server in one parameter, or in three, for example
date = "12/01/2019"
day = 01
month = 12
year = 2019
You need to record your scenario of choosing and submiting a date by using the HTTP(S) Test Script Recorder and to see how it sends in the request.
I have a data set spanning 2 years and is updated daily, created a dashboard to give a view of incidents by date group. I have created a parameter using date trunc for Day/Week/Month/Quarter/Year. This is in Tableau.
I am trying to get the parameter to show a Week to date, Month to date and so on view. IE if on Weds 15th Dec I selected the weekly view, it would only show data for every week in the data set for Sat-Weds (My weeks go Sat-Fri) or the monthly view every month between 1st-15th
Ideally I am wanting this as a simple parameter for a drop down menu, I can do the week to date stuff as a rolling sum restarting every week in a separate table, but for ease I just need a date group function that will allow to do this.
Any suggestions would be appreciated.
Cheers
Pete
The solution is 5 parts:
Date Part Parameter
Max date [Max Date]
Dynamic date part of the Max date [Dynamic Date Part Max]
Dynamic date part of the historical dates [Dynamic Date Part]
Filter those date parts <= the Max date [Dynamic Date - Lass than Max]
Date Part Parameter
Max Date
This is the calculation you'd use with your dataset to find the max date.
{ MAX([Order Date]) }
In order to create a good example, I'm going to set my Max date to a specific date the falls in the middle of a week, in the middle of a month and middle of the year. I'm going use June 13th, 2018 as my Max Date.
So, if you want to follow along you can use the below date as your max date. You can also use this data set if you'd like.
DATE(#2018-06-13#)
Dynamic date part of the Max date
DATEPART([Select Date Part], [Max Date])
Dynamic date part of the Historical dates
DATEPART([Select Date Part], [Order Date])
Filter on Historical dates parts <= the Max Date
[Dynamic Date Part] <= [Dynamic Date Part Max]
Now that we have all the pieces we need let's check to make sure they are working as we would expect.
Looks like we're seeing all the days of the month that are <= the 13th.
When we change it to Day of the Week we see only the days of the week <= the 4th day of the week which is Wednesday when the week starts on Saturday.
Now let's calculate the running sum of sales along our dynamic date part to better help you with your example.
Drag the measure you want to calculate the running sum onto the label, then create a quick table calculation. We'll next need to edit this table calculation as so.
You'll then see your calculation working as you would expect.
Hope this was helpful. Happy vizzing!
In one worksheet, to display the measure value (Sales) of Last 12 Months(LTM) and Previous 12 Months(PTM) from the selected month.
Current Month is 2018-June , By default selection
PTM date range for the sales period as (2016-June to 2017-May)
LTM date range for the sales period as (2017-June to 2018-May)
If user selects different month from the drop down, let's select (Apr 2018)
PTM date range as (2016-Apr to 2017-Mar)
LTM date range as (2017-Apr to 2018-Mar)
This can be done using a parameter. Here are the steps involved:
Create a date parameter
Create a calculated field as below(You might need to fine tune it to match your exact requirements)
Add the calculated field to filter card to show only 'SHOW'
In any time series chart, it looks like Tableau defaults to the first day of the month on the tick marks.
Is there a way for Tableau to show the last day of the month instead?
You can sort of force it by going into "Edit Axis", starting it on a month end, and 1 as the monthly interval. However, this is not a dynamic process and would require that I update this every time I had new data.
Anyone have any ideas? Thank you!
If in your data series you want each data point to represent the whole month, and you just want to label it with the last date of that month, then this workaround might work:
use calculated field to coerce all dates in the month to the last date of that month: DATEADD('day',-1,DATEADD('month',1,DATETRUNC('month',[Order Date])))
use this field as date in your time series
use 'More -> Custom -> Month / Day /Year' as display option for this field
BO Version: 12.1.0 on Infoview,
O/S: W7
I am creating a report in infoview, which is a cross-tab. I have departments on the row side and for the column I want to have all Saturday dates dynamically displayed, and this is dependent on the date prompt values I put in to the report when I run it.
So if I put in for the prompts Dec the 08th 2013 to Jan the 04th 2014 I should see 4 Saturday dates (14th/21st/28th/04th) along the column headers.
I started off using a variable and using the function relativedate, which gave me all the dates I wanted:
=RelativeDate(LastDayOfWeek([Query 1].[Episode End Date]);-1)
but because I used -1 to get the Saturday date it was giving me the Saturday before the earliest prompt date, so I was getting these dates instead:
(07th/14th/21st/28th/04th)
Is there a way I can get these dates but ignore the previous day (the 7th) before the start prompt date?
I want to have this dynamic so that if I put a date range in it shows me all the saturday dates within that range along the top of the report regardless of the date range period.
Andrew
The reason you're having trouble is that WebI (being ISO compliant) considers a week to run from Monday to Sunday, but your reporting week ends on Saturday.
So, I would approach it this way:
=RelativeDate(
LastDayOfWeek(
RelativeDate([Query 1].[Episode End Date];1)
)
;-1)
If we evaluate some dates with this logic, we'll see the desired result:
Testing 12/8 (Sunday):
Add one day = 12/9
Get Last Day Of Week = 12/15
Subtract one day = 12/14
Testing 12/12 (Thursday)
Add one day = 12/13
Get Last Day Of Week = 12/15
Subtract one day = 12/14
Testing 12/14 (Saturday)
Add one day = 12/15
Get Last Day Of Week = 12/15
Subtract one day = 12/14
I'm at home and don't have access to WebI right now, so I can't test this myself, but the logic should be sound.